Lightroom :: How To Change Order Of Photos In Gallery
Jan 15, 2013How to change order of photos in Lightroom gallery?
View 2 RepliesHow to change order of photos in Lightroom gallery?
View 2 RepliesI created a Web Gallery and forgot to update the folder name for the FTP server.
How can I update the saved gallery? If you change module and double click again on the saved gallery icon, the changes are lost.
Here is what I get via right click:
How do you solve this without the need to delete and save the gallery again?
When I upload new photos to an existing album they displayed after existing photos. I need new photos to be displayed before existing photos. It is in the nature of the work that I do. My customers need to locate their photos with minimal effort. Is there a way to set the program to accomplish this?
View 2 Replies View RelatedI'm using a Mac, Lightroom 3 uploading to a host monster.com server. the Lightroom HTML gallery displays fine when exported and opened offline but when uploaded to my server, backgrounds and navigation and cells appear fine but all the photos appear to be missing. the source code appears to have the correct path. When I've seen this question earlier users suggest that the photos are being put in a bin file but mine look to be in the correct path on the server. Other users suggest changing code in some Lightroom files perhaps using the SDK but I can't find the files they suggest changing (I think they might have been on pcs instead of macs). .
Here is a link to the page [URL] ....
I am new to LR 3 , after downloading photo's from 3 CF cards from a wedding then editing I put chosen best shots into a smart collection and all seemed in order numbers wise etc, when I burnt to a disc they are now not in order of the days event, how can I make sure they are of the following : -
1 - All the same size photo's ready to be printed or put in an album.
2 - How can I make sure the order in which I see them in the library smart collection is burnt in the same order onto a disc, as I have burnt from library and they are all out of order of the wedding event when looked at on the disc !!
I'm wanting to create a photobook of the last few years and need to order my photos by the date I took them. I am looking at all my photos in the Libaray but they are not in order of the date I took them. I presume it's under Library filters somewhere but I can't find it. I've checked date under attribute but they're not right.
View 2 Replies View Relatedmy photo's are in numbered order in the library but when burned to disc are all random, they have been edited from 3 cards and saved as a smart colllection, how can I get them to burn in order as library shows them !
View 4 Replies View RelatedWhen I import new photos in the catalog, it reverses the chronological order in which they were taken - i.e., for photos taken on the same day, it would show the latest first.I don't think I changed any settings regarding the importing of photos in the catalog.
View 2 Replies View RelatedWhen I try to swap a photo into a different order, an error message tells me that "The currently selected Source does not support custom order".
View 2 Replies View RelatedI would like to change the default filename for the HTML pages produced by Lightroom 3 in the web gallery. Specifically, I would like to remove the string "_large" from the HTML filename, so it corresponds exactly to the image filename.
Specifically, the URL by default is like this: [URL] ....
and I would like it to be like this: [URL] ....
I assume there is some way to make this change using the template editors, but I can't figure it out.
how do I re-order or change the order of images within a file?
View 2 Replies View RelatedI have a number of sub headings within a main keyword and I wish to change the order. In Elements it was possible to click and hold on the sub heading and move it to the desired position. This does not seem to work in LR3.
View 4 Replies View Related*smacks the foreheard* I forgot to change the timezone on the camera when I arrived in a different continent and all my pictures are 8h behind. I have imported the holidays pictures into folders arranged by the day the pictures was taken and therefore many of the pictures are put in the wrong folder.
Correcting the pictures for the difference in the time zone was a cinch. However the pictures are still in the wrong folder! Updating/Synchronizing the folder does not put the pictures in the right folder.
Can you change the order of images in contact sheet in Lightroom 4 Print module?
View 2 Replies View RelatedMy Web Photo Gallery feature in Photoshop CS has all of a sudden started to rotate vertical photos to the horizontal position. In the finished gallery the thumbnails and large photos are rotated. When I open the images in Photoshop they are correct and in the vertical position. Any advice on reverting it back to the way it is supposed to be? I've looked through all the tabs and can't find where I might have accidently changed something to have caused this.
I did notice that when I just try to make a web gallery of only a few images they appear correct.
When I "Get Photos" from a camera and choose to rename them (with "Name" + 001 option), they are acquired and renamed in no particular order and occasionally have the incorrect date.For example, I took 5 photos on 2/21, 4 photos on 2/22, and 3 photos on 2/23 (today). When I imported them into Photoshop Album Starter Edition 3.2 and sort them by date, the filename numbers are in an almost random order, e.g. 2009Feb018, then 2009Feb002, then 2009Feb012 are the names of 3 photos taken within minutes of each other.In addition two of the 4 photos taken 2/22 show a date of 2/21.When I download photos from my camera to Adobe Photoshop Album Starter Edition 3.2, how do I get them to download in chronological order?
Operating System:
Windows XPBrowser: Mozilla
The images appear less saturated with a green-ish tint while viewing the images on a calibrated Macbook Pro Retina display 15".
View 2 Replies View RelatedLightroom is saving all my photos in the wrong folder from that I want and I can not find for the life of me where to change that in LightRoom 4?
View 2 Replies View RelatedI am trying to use the web photo gallery with Photoshop 7. If you select the bottom option something like vertical slide gallery it will automatically change every 10 seconds. How do I change that 10 seconds to something like 4 or 5 seconds. I can't find anywhere to do this.
View 4 Replies View RelatedAdobe Photoshop Elements 12: I need to create a Web Photo Gallery so I can upload thumbnails and full-size pictures to my own website. No Facebook, Flickr, Adobe Revel etc.
View 2 Replies View Relatedwhen I access in Lightroom 4.4 a folder which had been edited originally (and imported) in Lightroom 3, the options and settings for Developing and editing in LR 4 change to appear like the old options in LR3 (Exposure, Recovery, Fill Light and Blacks, instead of Highlights, shadow, whites and blacks etc..). Why is Lightroom 4 doing this. Most of the files I am trying to edit have not been touched before in LR 3 but were simply imported originally into the catalogue from LR3.
View 1 Replies View RelatedI've recently moved from iPhoto and already had a hard time figuring out how to replicate the "hidden" photos and how not to display them in lists etc. by default.
Now I'm hanging on another thing I simply couldn't find in LR4 yet but believe it must be there - at least it would be a no-brainer to implement this if I were a programmer of LR.
The feature I'm talking about is the user-definable preview picture for each "event" in iPhoto.
In LR, in the Library module, there is this folder selection menu on the left-hand panel. Now when I hover all the folders shown there the picture in the Navigator changes to resemble the respective first picture in each of the folders.
What I want to do is select a different "preview" picture for each folder and save this setting inside the Lightroom catalog I'm currently in.
How do I accomplish that - or is it impossible with the current version of Lightroom?
Example: New card, 100 photos taken, imported w/ name changes to LR catalog, all is well. Then, another 100 photos taken, and when import attempted, the prog "sees" 200 photos as new, not the actual 100 new photos on the card. Yes, the bottom is checked to avoid duplicates.
View 2 Replies View RelatedTrying to make a slideshow in LR4, however I can't seem to change the duration on individual photos. i can set the speed for the slideshow, but this speed is globalized to all photos. Can I change this so that I can change duration of individual photos?
View 2 Replies View RelatedUsing PSE 11. I am trying to sort my photos in order Newest first. I select Sort by: Newest and they are sorted in newest DATE order but within each date they are sorted on oldest time order, which seems odd... how can I get PSE to sort so that Newest is based on date and time?
View 7 Replies View RelatedHow can I save the order of photos in albums in Elements 11? Even though I have set as album order they revert back to original order.
View 1 Replies View RelatedHow can I change my CS default to open in ACR instead of photo gallery which it says is not updated?
View 11 Replies View RelatedHow to change the keyboard shortcuts for applying Color Labels to photos? I have Keyboard Tamer, and I was able to remove the shortcuts for applying star ratings, but there seems to be no way to change the commands in Photo > Set Color Label.
See, many times a day I will click the white balance color temperature fileld and start typing "5500" only to then realize that the click on the entry field didn't activate it and I have now inadvertently changed the ratings and/or label colors for several photos. Super frustrating to then have to undo a bunch of times, especially when I'm viewing based on rating and/or color label, because photos can spontaneously vanish from view.
I'm experiencing a bit of an organization problem with Lightroom 3 which is probably rather easy to fix, but I just can't seen ti figure out how. When I import photos in Lightroom it automatically creates folders (2011-12-14 for example) and I would like to change the location on my computer for these folders, but I can't find where to do it. It now creates these folders in my regular Pictures folder which gets really messy due to this. How can I change this? And how do I relocate all the excisting folders on my laptop, without having to find all the missing photos afterwards.
View 3 Replies View Relatedhow do i re size a photo? i need to size my photos to 1170 X 360 in order for them to post to my web site.
View 3 Replies View RelatedI have been trying to copy an album in Elements 8 to a DVD, but I cannot find a way to keep thim in the order that I have arranged them in the album. What is the correct procedure? It's a Windows 7 system.
Also, is there a way to create the DVD so it can be played on a TV DVD player?