Photoshop Elements :: Re-order Or Change Order Of Images Within File?

Sep 26, 2012

how do I re-order or change the order of images within a file?

View 2 Replies


ADVERTISEMENT

Lightroom :: Re-order Images In Folder After Timezone Change?

Mar 28, 2013

*smacks the foreheard* I forgot to change the timezone on the camera when I arrived in a different continent and all my pictures are 8h behind. I have imported the holidays pictures into folders arranged by the day the pictures was taken and therefore many of the pictures are put in the wrong folder.
 
Correcting the pictures for the difference in the time zone was a cinch. However the pictures are still in the wrong folder! Updating/Synchronizing the folder does not put the pictures in the right folder.

View 4 Replies View Related

Photoshop Elements :: How To Change Slide Order In Slideshow

Jun 6, 2013

In Photoshop Elements Organizer, how do you change the slide order in a slide show?

View 3 Replies View Related

Photoshop Elements :: How To Change Order Of Photographs In Organizer

Mar 14, 2014

How do change the order of my photographs in Organiser?  I do not want them in a date and time sequence,

View 1 Replies View Related

Photoshop Elements :: Display Order In Which Images Are Shown Within Album?

Oct 8, 2013

Can you display the order in which images are shown within an album, (like you could in PE10), other than the stupid Oldest and newest that you now get with PE11?

View 2 Replies View Related

Lightroom :: 4 - Can Change Order Of Images In Contact Sheet In Print Module?

Jul 18, 2012

Can you change the order of images in contact sheet in Lightroom 4 Print module?

View 2 Replies View Related

Photoshop Elements :: Can Change Photo Downloader Sort Order In 11

Jul 7, 2013

The default sort for the Photo Downloader seems be by date and time. I recently purchased a camera the does up to 10 fps and the Downloader does not seems to have resolution to sort the micro-second or even second. I batch download the images and also do a rename of the files in this format yyyymmdd-###. I am finding my action sequences are all out of order. What I really just need the Downloader to do is sort by sequential camera number just like it comes out of the camera. Then all the images would be renamed in the right order. I tried modifying the XML settings file but that was no success. 

View 5 Replies View Related

Photoshop Elements :: How To Change Sort Order Of Catalogs Or Folders

Nov 16, 2012

how do I change the sort order of the catalogs or folders?

View 4 Replies View Related

Photoshop Elements :: Images Imported From Disc Unsorted - Changing Order

Sep 13, 2013

PSE11 organizer is apparently "unsorting" images imported from disc. Consequently sequences of pics are completely mixed up. Can it be corrected?

View 2 Replies View Related

Photoshop Elements :: EO11 File Import Order

Aug 25, 2013

In Elements Organizer 11, when I "Import from Camera or Card Reader" and have it rename files, adding a number to a Custom Name, it imports the newest file first, adding the lowest number to the newest file in the camera (in this case an iPhone) and the largest number to the oldest file. Is there a way to make EO11 import files oldest first from a camera, adding the numbers in order from oldest to newest?

View 1 Replies View Related

Illustrator :: Stacking Order Not Controlling Order In Which Squares Are Arranged?

Mar 6, 2013

Here I have several concentric squares in an uninterrupted stack.I moved the topmost (small orange) one vertically.I then went to the Alignment panel, selected all the squares and clicked on the one I moved.Then I clicked on Vertical Distribute Center.

The right hand picture shows what happened.One of the squares (that big orange one) near the bottom of the stack shot up so that its centre was above the centre of the topmost one in the stack.The centres are evenly distributed but why is the stacking order not controlling the order in which the squares are arranged?
 
Fortunately the positioning of that big orange square was easy to correct, but something tells me this is not the way things are supposed to happen.Seemingly this does not always happen. I have tried the method on several stacks. Some were o.k., others showed similar behaviour to the above.

View 10 Replies View Related

Photoshop Elements :: Folder Mode Sorts Files In File Name Order

Nov 23, 2012

Elements 10 / Folder Mode sorts files in "file name" order; is there a way to do this in Elements 11

View 1 Replies View Related

Photoshop Elements :: When Importing Pics Into Organizer File Order Is Jumbled

Sep 1, 2013

I take high school sports photos using a Canon 7D camera, that can take about 9 pictures per second, which is great for capturing events.  I've noticed with several versions of Photoshop Elements (9 &11), on Win 7 Pro 32 AND Win 7 Pro 64 versions (on multiple computers) that when I use Get Photos & Videos|From Camera or Card Reader, then in the photo downloader dialog box, use the Rename Files option, that my picture files get renamed in jumbled fashion.  Not all pictures are jumbled, but many.  If I have files on my Canon such as DIG001.jpg, DIG002.jpg, DIG003.jpg, DIG004.jpg, they may be renamed as RenameFilename001.jpg (which is acutally DIG001.jpg), RenameFilename002.jpg (which is actually DIG003.jpg), RenameFilename003.jpg (which is actually DIG002.jpg), RenameFilename004.jpg (which is actually DIG004.jpg) - in this case original picture files 2 & 3 have been reversed.  This is very confusing when reviewing a photo sequence that is renamed into an out of chronological order sequence (i.e. ball is hiked, ball is caught by receiver, ball is kicked, receiver runs with caught ball). 
 
I have also confirmed that there is nothing wrong with the Canon 7D camera by taking high speed pictures of a video which is displaying video frame numbers.  I can confirm that the files as stored in the camera are in the direct chronological order as taken (i. e. 001, 002, 003, 004, etc.).  When I then download these pictures from the camera using Photoshop Elements 11, they are not all in chronological order (some are, some aren't).
 
I don't know if this is a bug in the program or there is something else I need to do to assure the pictures are imported in exact chronological order (as taken by the camera).

View 2 Replies View Related

Photoshop :: Change The Order Of Layers

Oct 28, 2005

Change the order of layers I have created. So they sit on top of each other, in a different order.

View 8 Replies View Related

Photoshop :: How Do I Change The Order Of Styles In...

Jul 10, 2009

I have gone through quite a number of pre-made styles and made a few of my own styles. I have a pallet with about 30 styles that I use the most. How do I rearrange them so those that I use the most appear at the top of the pallet? I am using Photoshop CS4 Extended. 

View 3 Replies View Related

Photoshop :: Save Images In Order To Be Resized Later?

Oct 29, 2012

I'm working as a designer. Whenever I send images to my boss (usually jpgs saved in photoshop), she can't resize them. Is there a certain way I need to save them in order for them to be resized later?

View 3 Replies View Related

Photoshop :: Folders And Images Not In Alphabetical Order

Feb 21, 2012

why all of a sudden all my images and folders are not in alphabetical order. everytime you re-name or add a file to photoshop it detects and goes in order. now ive got to search to see where that file is.

View 7 Replies View Related

Photoshop :: Automatization :: Arrange 6 Images In 2 X 3 Order

Mar 12, 2007

I would like to arrange 6 images in 2 x 3 order. I have an older version 6.0 and I am not aware that it is posible to script/macro to do this autamatically. Is it posible in some newest version?

View 2 Replies View Related

Photoshop :: Change The Order In Which Photos Are Displayed

Feb 19, 2013

When I upload new photos to an existing album they displayed after existing photos. I need new photos to be displayed before existing photos. It is in the nature of the work that I do. My customers need to locate their photos with minimal effort. Is there a way to set the program to accomplish this?

View 2 Replies View Related

Photoshop :: Change Default New Layer Order / Top To Bottom

Jun 28, 2013

By default Adobe Photoshop creates new layers on top of the current layer. In the Western languages we read from top to bottom and left to right. So when I start creating a web site in Photoshop I start from top to bottom as well. However Photoshop creates the new layer above the current, which is the opposite of what I would like to do. I need Photoshop to create new layers below the current layer. I know by holding CTRL/COMMAND and clicking the NEW LAYER icon, will do what I need. However if I do CTRL+J to jump/duplicate the current layer, or select a layer and ALT+DRAG again to duplicate it, again it puts the new layers in top. Is there a way to reverse the default order Photoshop places layers? If not, I suggest that to Adobe implement an option in the general settings for Photoshop. Flash for example had similar option to read/place layers from top to bottom or bottom to top.

View 3 Replies View Related

Photoshop :: CS6 Won't Open After Change Order Of Scratch Disk

Jun 14, 2012

Changed order of scratch disks for PS CS6 and now can't open PS.  Get the following messages:

Could not open a scratch file because the disk is not available.

Followed by :

Could not initialize PS because the disk is not available.  Everything works.  Reinstalled PS CS6 and get the same message.

View 8 Replies View Related

Photoshop :: File Order In 7

Nov 14, 2008

go to open and the files are listed in size order and not name order as they were. Any idea on how to change it back?

View 1 Replies View Related

Photoshop :: CS6 - How To Change Byte Order Default On Save Dialog Box

Sep 28, 2012

When saving a TIFF file on Adobe PSCS6, the "Save" dialog box always defaults the byte order to MacIntosh rather than IBM PC  even though I am using a PC.  I have checked Edit>Preferences but can't find an adjustment for this.  Do I have to just live with it?

View 3 Replies View Related

Photoshop :: Open Two Images Simultaneously In Order To Copy A Layer From One Image To Another?

Oct 18, 2013

How do I open two images simultaneously in Photoshop in order to copy a layer from one image to another?

View 1 Replies View Related

Lightroom :: Cannot Re-order Images In Grid View

Nov 26, 2013

I was able to re-order images in the grid view just by dragging them. Now I cannot move images.

View 2 Replies View Related

Lightroom :: Sorting Images In Folder With Use Order?

May 18, 2012

lets say i have 200 images in a folder, and i want to put the last image in the number 1 spot with Use Order.
 
Is there a faster way to move that image to the top? Rather than dragging the image?

View 5 Replies View Related

Lightroom :: Reversed Order Of Images Emailed From LR5 On Mac

Jan 17, 2014

This has been a problem ever since LR3 and on previous versions of the MacOS. I hoped that it would be fixed in LR5, but not yet. When I select multiple images for email in LR5 on a Mac running Mavericks, the preview shows the images in the correct order, but in the email message itself, the order is reversed so that the last image is first and the first image is last. Nothing works. If you select the images in a different order, the result is the same backwards order. Lightroom – How Do You Change the Order of Images, Before Renaming?
 
The only workaround is to create a separate export for each image or to export a folder of images and manually add them to a single email.
 
In addition, it would be useful if there were a space between images in the email so that the images don't all run together in one long strip. There should be a way to have this happen by setting up a style or template so that it does not have to be done manually.

View 4 Replies View Related

Lightroom :: Images Are Not In Order In The Import Dialogue Box?

Mar 1, 2013

using lightroom 4.3...  when I import photos, they appear in random order in the IMPORT viewing window.  With pervious versions of lightroom, they were always in order of file name.  It becomes more time consuming to select specific files to import to a file if there are 2 or more jobs on one CF card ( I have photos of my kids skiing mixed up with a portrait session.).  Is there a way to sort the photos (by file name, or time) before import?  I do know how to sort post import.

View 1 Replies View Related

AutoCAD 2013 :: Change Selection Order

Mar 8, 2013

I know that when I select a group of objects and then list them, the list displays the properties in the order I drew them, is there any option I can change this order? I mean, for example the direction I select them or something like that.

View 1 Replies View Related

AutoCAD Inventor :: Change First View Order

Mar 12, 2012

Is there any way to modify the order of the views that have been placed on the drawing sheet?  We have a lot of times where we place an assembly view to drive the title block and then place the child components for detailing.  Too many time the assembly view gets forgotten until you are done detailing the other parts, now instead of the assembly name showing on that sheet it is the first part you inserted.  I would like to be able to select a view and tell Inventor that I would like this view to be the first view instead so I don't have to copy and past everything from one sheet to another.  I used to have some code that looked at that first view but I can't find it anymore.

View 1 Replies View Related

GIMP :: Unable To Change Order Of Layers

Nov 3, 2013

I have used Gimp for years and today I simply cannot move layers. In the layers dialog I usually drag the layers into the desired order but for no reason the layers simply float back to their original position. I have tried;

- Clean install of gimp
- Opening various gimp files (xcf)
- Creating new xcf files
The layers are not;
- Locked
- Floating

I have attached a video of the problem, which can also be viewed at;

[URL].......

View 3 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved