Photoshop Elements :: How To Change Order Of Photographs In Organizer

Mar 14, 2014

How do change the order of my photographs in Organiser?  I do not want them in a date and time sequence,

View 1 Replies


ADVERTISEMENT

Photoshop Elements :: How To Reset Order Of Album Containing Many Photographs

Jul 9, 2013

I wish to reset the order of an album containing many photographs.  The current album order is somewhat random.  I'd like to rest the album order to date/time order as the first stage to sorting the photos as I want them, which is not strict date/time order.  How can I do this?

View 2 Replies View Related

Photoshop Elements :: Mac Version - Exporting Of Photographs From Organizer?

Oct 11, 2012

I have the mac version of photoshop elements 10 which does not support exporting of photographs in the organizer.I use to be a Windows user of the program and like this feature. It is a major flaw in the mac version. Corrected flaw in version 11?

View 1 Replies View Related

Photoshop Elements :: Re-order Or Change Order Of Images Within File?

Sep 26, 2012

how do I re-order or change the order of images within a file?

View 2 Replies View Related

Photoshop Elements :: Pictures Are Out Of Order In Organizer Window (10) And Can't Move Them Around

Feb 21, 2013

My pictures are out of order in the Organizer window (PSE 10) and I can't move them around.

View 4 Replies View Related

Photoshop Elements :: Import Photos Into Organizer In Same Order As They Are In Files?

Feb 5, 2013

How can I import photos into Organizer in the same order as they are in my files?

View 3 Replies View Related

Photoshop Elements :: Organizer Doesn't Present Thumbnails In Alphabetical Order

Nov 6, 2012

the organizer doesn't present thumbnails in alphabetical order which is crucial for my business as everything I do is based on a running number. There fore I like to suggest to Adobe to create a patch where this problem is fixed. Its a shame that Elements 11 doesn't contain this function as it has any way been improved in so many other ways.

View 1 Replies View Related

Photoshop Elements :: When Importing Pics Into Organizer File Order Is Jumbled

Sep 1, 2013

I take high school sports photos using a Canon 7D camera, that can take about 9 pictures per second, which is great for capturing events.  I've noticed with several versions of Photoshop Elements (9 &11), on Win 7 Pro 32 AND Win 7 Pro 64 versions (on multiple computers) that when I use Get Photos & Videos|From Camera or Card Reader, then in the photo downloader dialog box, use the Rename Files option, that my picture files get renamed in jumbled fashion.  Not all pictures are jumbled, but many.  If I have files on my Canon such as DIG001.jpg, DIG002.jpg, DIG003.jpg, DIG004.jpg, they may be renamed as RenameFilename001.jpg (which is acutally DIG001.jpg), RenameFilename002.jpg (which is actually DIG003.jpg), RenameFilename003.jpg (which is actually DIG002.jpg), RenameFilename004.jpg (which is actually DIG004.jpg) - in this case original picture files 2 & 3 have been reversed.  This is very confusing when reviewing a photo sequence that is renamed into an out of chronological order sequence (i.e. ball is hiked, ball is caught by receiver, ball is kicked, receiver runs with caught ball). 
 
I have also confirmed that there is nothing wrong with the Canon 7D camera by taking high speed pictures of a video which is displaying video frame numbers.  I can confirm that the files as stored in the camera are in the direct chronological order as taken (i. e. 001, 002, 003, 004, etc.).  When I then download these pictures from the camera using Photoshop Elements 11, they are not all in chronological order (some are, some aren't).
 
I don't know if this is a bug in the program or there is something else I need to do to assure the pictures are imported in exact chronological order (as taken by the camera).

View 2 Replies View Related

Photoshop Elements :: How To Change Slide Order In Slideshow

Jun 6, 2013

In Photoshop Elements Organizer, how do you change the slide order in a slide show?

View 3 Replies View Related

Photoshop Elements :: Can Change Photo Downloader Sort Order In 11

Jul 7, 2013

The default sort for the Photo Downloader seems be by date and time. I recently purchased a camera the does up to 10 fps and the Downloader does not seems to have resolution to sort the micro-second or even second. I batch download the images and also do a rename of the files in this format yyyymmdd-###. I am finding my action sequences are all out of order. What I really just need the Downloader to do is sort by sequential camera number just like it comes out of the camera. Then all the images would be renamed in the right order. I tried modifying the XML settings file but that was no success. 

View 5 Replies View Related

Photoshop Elements :: How To Change Sort Order Of Catalogs Or Folders

Nov 16, 2012

how do I change the sort order of the catalogs or folders?

View 4 Replies View Related

Photoshop Elements :: Color Change From Organizer To Edit

Feb 22, 2014

When I open an image in 'edit', the reds become much more saturated than when it was viewed in the organizer. The amount of red saturation is abnormal and the photo remains this way afterwards, even when viewed in the organizer or opened with other software. Why is this happening and how do I stop this from happening?

View 1 Replies View Related

Photoshop Elements :: Transfer Entire Organizer Of 9 To Empty Organizer In 12?

Nov 2, 2013

How do I transfer the entire organizer of Elements 9 to the empty organizer in Elements 12? By the way, Elements 9 is so defective, it will not even let me back up my organizer in 9. The 9 organizer would let me select a photo, bring it into the editor, print it and then it would crash... then I had to start all over again... the darn thing crashes as it was prone to problems that adobe ignored. Is it better to just re-load all the photos from a fresh folder that is on my desktop? There are 5,000 !

View 1 Replies View Related

Photoshop Elements :: Organizer Update Finds Pics Already In Organizer

Dec 17, 2012

I'm using PE9. Every time I go to the Organizer (even after switching to another program briefly) the Update box appears, searching Watched Folders for new pics.  It always finds them, frequently the same, imports them and then tells me they're already in the Organizer.  During this process, which may last 5-15 minutes, I can't use the program. 

View 1 Replies View Related

Photoshop Elements :: Sequencing Of Photographs

Jan 1, 2013

I went into Windows 7 Picture Manager and annotated the images with a number and a short description. This gets them into the order that I want. When I imported them into a newly acquired Elements 11, the program put them into DATE order. How can I get the sequence into the order that I WANT, ie, by image name, something that W7PM does quite happily?

View 1 Replies View Related

Photoshop Elements :: Add Captions To Photographs?

Apr 10, 2013

How do I add captions to my photographs?

View 1 Replies View Related

Photoshop Elements :: How To Add Copyright Symbol To Photographs

Aug 19, 2013

Where I can find the Copyright "c" symbol?  I'm tryting to add it to my photographs.  I have PSE 9

View 6 Replies View Related

Photoshop Elements :: Copy The Photographs Into Another Computer?

Jan 21, 2014

I have thousands of photographs in my desktop and wish to copy them to my laptop. And is it possible to sychronise them? Both computer use Windows 7 and PSE 11.

View 1 Replies View Related

Photoshop Elements :: Add Watermark To Photographs Before Sharing Them?

Sep 16, 2012

How can I add watermark to my photographs before sharing them?

View 2 Replies View Related

Photoshop Elements :: How To Edit Photographs Correctly

Jan 14, 2013

Procedure to follow to correctly edit my photographs?

View 1 Replies View Related

Photoshop Elements :: Emailing Photographs In PS11

May 28, 2013

When I try to send photographs from Elements 11 I get the message 'Error trying to save message to outbox' ( I have had my email address verified)

View 1 Replies View Related

Photoshop Elements :: Finding And Deleting Duplicate Photographs?

Dec 26, 2012

Can Photoshop Elements compare metadata to find duplicate photo's and display them side by side for manual deletion?

View 1 Replies View Related

Photoshop Elements :: How To Size Photographs For Email Attachment

May 14, 2013

how should I size a photograph to attach it in sensible proportions to an e-mail when using Elements 11?  In Elements 9 I set the dpi at 72 and then the longest length at 1024mm.   he shortest length was set automatically by the programme.  Elements 11 doesn't allow me to do this.  I've tried starting off with 72 dpi but as soon as I enter the longest length the dpi changes.  This did not happen with E9 and in E9 the size of the attachment was measured in KB's but with E11 I finish up with quite large MB sizes. 

View 2 Replies View Related

Photoshop Elements :: Transfer Photographs From Computer To Adobe?

Jun 13, 2013

how do I transfer my pictures from my computer to Adobe?

View 4 Replies View Related

Photoshop Elements :: How To Use Layers To Edit Digital Photographs

Jan 31, 2014

I am having trouble figuring out how to use layers to edit digital photographs. Based on the online tutorials I've viewed, I'm under the impression that in order to edit parts of a photograph without affecting the original background image, I am supposed to create a layer for each set of edits I want to make and then merge these layers together to form a complete edited image with all the touch ups I want to make. I am also under the impression that any edits I make to the layers I create should not be showing up in the original background image, otherwise I have no way of comparing the original to the edited parts of the image to see if everything looks the way I want. Is there any way to make edits to image layers without these changes showing up in the original image and if so, how do I do it?

View 1 Replies View Related

Photoshop Elements :: 10 Mac Version - Download Photographs To IPhone?

Oct 11, 2012

I use photoshop elements 10 with the organizer as my photo catalog.  I have deleted my photos off my iphone.  I want to get a selet few of the photographs back onto my phone.  I thought the easiest way would be to use iphoto with itunes. I don't want to email myself each individual photograph back to myself.  My filing system is as following tree
 
Pictures/photoshop/Each year I have take photographs/Month I have taken photographs/
 
 itunes does not recongize all the sub folders so I would have to download the whole catalog into my iphone.
 
Prefer this method would be to make up an iphone album in the organizer and just have these photos downloaded to my phone.
 
Even if I did this system, however, the mac version of photoshop elements does not let you export photos to create a folder in my system for itunes to syn with.

View 1 Replies View Related

Photoshop :: Change The Order Of Layers

Oct 28, 2005

Change the order of layers I have created. So they sit on top of each other, in a different order.

View 8 Replies View Related

Photoshop :: How Do I Change The Order Of Styles In...

Jul 10, 2009

I have gone through quite a number of pre-made styles and made a few of my own styles.�I have a pallet with about 30 styles that I use the most. How do I rearrange them so those that I use the most appear at the top of the pallet?�I am using Photoshop CS4 Extended.�

View 3 Replies View Related

Photoshop :: Change The Order In Which Photos Are Displayed

Feb 19, 2013

When I upload new photos to an existing album they displayed after existing photos. I need new photos to be displayed before existing photos. It is in the nature of the work that I do. My customers need to locate their photos with minimal effort. Is there a way to set the program to accomplish this?

View 2 Replies View Related

Photoshop :: Change Default New Layer Order / Top To Bottom

Jun 28, 2013

By default Adobe Photoshop creates new layers on top of the current layer. In the Western languages we read from top to bottom and left to right. So when I start creating a web site in Photoshop I start from top to bottom as well. However Photoshop creates the new layer above the current, which is the opposite of what I would like to do. I need Photoshop to create new layers below the current layer. I know by holding CTRL/COMMAND and clicking the NEW LAYER icon, will do what I need. However if I do CTRL+J to jump/duplicate the current layer, or select a layer and ALT+DRAG again to duplicate it, again it puts the new layers in top. Is there a way to reverse the default order Photoshop places layers? If not, I suggest that to Adobe implement an option in the general settings for Photoshop. Flash for example had similar option to read/place layers from top to bottom or bottom to top.

View 3 Replies View Related

Photoshop :: CS6 Won't Open After Change Order Of Scratch Disk

Jun 14, 2012

Changed order of scratch disks for PS CS6 and now can't open PS.  Get the following messages:

Could not open a scratch file because the disk is not available.

Followed by :

Could not initialize PS because the disk is not available.  Everything works.  Reinstalled PS CS6 and get the same message.

View 8 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved