Lightroom :: 4 - Can Change Order Of Images In Contact Sheet In Print Module?
Jul 18, 2012Can you change the order of images in contact sheet in Lightroom 4 Print module?
View 2 RepliesCan you change the order of images in contact sheet in Lightroom 4 Print module?
View 2 RepliesLightroom 4 consistently crashes every time I attempt to print a contact sheet containing over 12 images. Any less and the task is completed without error, any more and it inevitably crashes.
My workaround has been to export the images and create large contact sheets in Photoshop CS6, but this takes twice as long. This is a daily task and is significantly disrupting my workflow.
I've been able to use the contact print area in earlier lightroom programs to create nice grid posters of events, characters in a play, etc. without any type under the images ie frame #s etc. I'm stuck in LR4 and can't get rid of the type and also can't seem to expand out the images to fill the white space in the poster to have just a grid, perhaps with some dark lines around the images.Is there a way to do this in LR4? or do I have to do the whole thing in Photoshop or in design.
View 1 Replies View RelatedWhen I construct a multi image contact sheet and send it to my printer the file is aborted. Mac Pro, 15 GB ram, OSX 10.6.8, Epson 7890. LR4.
View 2 Replies View RelatedJust upgraded to CS5.1 I see contact sheet II has changed and is handled by Bridge / Output module.I don't like that you can't print directly from Bridge, but have to save as a pdf, then reopen the doc and print from Reader or PS.I can only hope that changes.
I created a custom layout in Bridge, 3.9 inch x3.9 inch at 300ppi. 3 across and 3 down. Made the contact sheet, saved as pdf. Opened in CS5.1Here's the problem. The document which is suposed to be 3.9.x3.9 (square) is actually 3.092 inch x 2.318 inch (not square!).
The reason for the problem is that I drag and drop the contact sheet onto another document template (it has logo, name, etc.) to print. The other document is 4.5" x 4.5" So the contact pdf doesn't fit the template. (This used to work great in CS3 as you didn't have to save the contact sheet as it was created. It was a layered doc which you could drag onto another doc / template.) I can't see any reason the contact sheet would not be the same as created in Bridge / output mod. when opened up in CS5
"Contact page" when images get transported on to page they reduce in size.I have also tried dragging the pictures onto the page but they still reduce in size.
View 2 Replies View RelatedWhen I choose Print in Paint.NET I am offered several layout options, including a 9 picture 'wallet' and 35 picture 'contact sheet'.
I want to use one of these to view several pictures together rather than wasting paper and ink, but I can't find out where to select the multiple pictures.
Years ago, there was a program of routine that would plot files to a sheet resembling a photographer’s contact sheet. You would tell it which folder to use and it would print the entire folder. You could tell it how many rows and columns and it would fill up the 8.5 x 11 or 11 x 17 sheet with little images of the files.
View 2 Replies View Relatedway to to automate a workflow as follows:
1. drop or select a folder of pics (sometimes up to 200 images)
2. create a contact sheet - just like the "File > Automate > Contact Sheet II" (I make contact sheets/proofs of 2-4 images per page)
3. print all the contact sheets on 8.5x11" sheets of paper
4. close contact sheets w/o saving.
I can't seem to combine the Contact Sheet II with other actions.
Alternatively I could continue to create my contact sheets with the existing Contact Sheet II tool, then save, then drag to print window/icon - but it would be much easier to handle it one step.
I also looked for Automator actions and can't seem to nail this thing. I even considered iPhoto - it does this "standard prints" thing which works great but I need the file names in the contact sheets (bummer).
I'm using a Macinotsh G5 2GHz DP, 2GB RAM, OSX.4.2, Adobe Photoshop CS2, Epson 4000 Pro.
Can't print captions in contact sheet with multiple photos in MAC OS Adobe Photoshop10
View 5 Replies View RelatedI have my photos organized into albums. I would like to print a contact sheet for each album, but would like it to include the album name. This seems like a very basic part of organizing, but it's not overly apparent how to do it. I would also like to resize the caption font on the contact sheet, too.
View 7 Replies View Related*smacks the foreheard* I forgot to change the timezone on the camera when I arrived in a different continent and all my pictures are 8h behind. I have imported the holidays pictures into folders arranged by the day the pictures was taken and therefore many of the pictures are put in the wrong folder.
Correcting the pictures for the difference in the time zone was a cinch. However the pictures are still in the wrong folder! Updating/Synchronizing the folder does not put the pictures in the right folder.
Is there a way to change the font color when using Custom Text in the print module?
View 3 Replies View Relatedhow do I re-order or change the order of images within a file?
View 2 Replies View RelatedI have a set of Lightroom Print templates that I am trying to use, that are all for a 4x6 print. I can't get it to work because my page setup in the print module defaults to letter size. When I go in and change the page setup, it messes up the template and it gets all jumbled. Then when I go on to the next template, it switches back to letter size again. I want to create and hold a 4x6 canvas so these templates can either be saved to a 4x6 .jpg or printed on 4x6 paper. I know I can save a printer and page layout as part of a template by clicking the "update settings" once I have it all as i want it, but I can't even get that far because it messes up the template as soon as I change the page settings to 4x6. How do I get the canvas to 4x6 on templates that are already created so I can save them as a 4x6 .jpg or print to 4x6 paper?
I even just installed a printer that only prints 4x6 to see, but again, when I change the page layout it completely messes up the template.
How do I change the default font that is used for printing "Photo Info" in the Print Module? The only option I can find is the Font Size option, but what determines the default font that Lightroom uses to print the photo info?
As far as I can tell there is no way to change the "Photo Info" color to something other than black, is this correct?
I'm trying to print a 13 page contact sheet from LTR 5. The program crashes. I can print the same sheets from LTR 4. It takes a lot longer to render in 5 than 4 as well.
View 3 Replies View RelatedI was recently shown how to create contact sheet pdf's in Lightroom 4 which could be emailed to clients onto which they could comment and return.
All this without the need for more software or so i thought. I cannot seem to make it work. What software is needed and what do I need to do?
Just started in lightroom (Win XP).
Cannot find any way to save a contact sheet?
How do I create a contact sheet with multiple photos?
View 1 Replies View RelatedCan you individually orient photos in a contact sheet
View 3 Replies View RelatedHow can i print contactsheets with labels, flags, stars.... in the print? I 'm working on a collection of + 7.000 files and i need a printed catalog of all the files with all the selection marks on the file.
Working with LR 4 on mac
For some reason images in the library module aren’t as sharp compared to the develop module. If I’m in develop images are nice and sharp but as soon as I select the library you can see the image quality drop and image becomes less blurry!
View 4 Replies View RelatedIn LR4 print module the print and print one tabs are greyed out and I can't reset.
View 1 Replies View RelatedIs there any way to change the default sort order of images displayed in the Library module? The default seems to be 'Capture time', but I would prefer to set it to 'File name'.
View 4 Replies View RelatedWhen it's time to print and save contact / index sheets, Lightroom enters another dimension.
Workflow as normal up to this point: Import (with 1:1 previews) a folder of NEF+JPGs, maybe a hundred or two. Edit, rename and export. Enter the Print module and setup (for the thousandth time) a contact sheet showing maybe 30-50 pics per page.
Select "Draft Mode Printing" and hit PRINT and sit. The "preparing print job" progress bar appears and starts to tick off images, at about 10 seconds apiece. In LR2 this *entire process* took 1-2 seconds. So, an hour and a half later, my contact sheets are ready. I could hand-draw them faster.
It does it in LR3, LR3.2 and LR 3.3. It *never* did it in LR1-2.7.
Mac OS 10.6.4
2.66 GHz Quad Core MacPro
8GB RAM
I am trying to print contact sheets in Bridge using keywords and/or star ratings from Lightroom. I'm doing that because rendering is incredibly slow if I try to do the same thing in LR even when I choose 240 ppi in the menu.
In Lightroom, I have selected "automatically write changes into XMP. For the folder and subfolders I'm working with, I have selected all of the images and hit command S to write all of the images into metadata. I've done this with the whole folder and with all of the subfolders as well. None of the star ratings show up in Bridge.
When I open Bridge, some of the folders show the keywords while others that I have processed the exact same way do not. All of the images are NEFs shot with at Nikon D800.
I've also tried opening and closing Bridge as well as purging the cache.
I'm on a Macbook Pro early 2011 running OS 10.8.6.
I wanted to create an A4 borderless print in my canon mg6150 from within the print module. I can do a borderless print using the canon easyprint.
I go into page setup and the properties of my printer and set the page layout to borderless and click OK.
However, I am unable to set the margins to zero. When I go back into my page setup and check the page layout, it has reverted to normal so it has ignored my setting.
All was working OK and the printer is showing ink cartridges almost full In the Library Module the print review is fine.
Switch to Print Module and the print review is now blank (100% white)
Pictures no longer print
Windows 7
Espon Artisan 835 printer
LR5.3
I cannot seem to reset the print template screen while in the " Print " module. It has adopted the smallest pic size with three times the normal border. I wish to reset to full screen in print module
View 1 Replies View RelatedHow to ADD (almost) white Border around photo(s) to print in print module (not for creating a JPEG) WITHOUT TRIMMING the photo?
I dont understand why I'm so stupid not to be able to acheeve this simple task with Lightroom WITHOUT TRIMMING the image (altering it's proportion and cutting away photo-content)
(on light-gray backgrownd for instance, to use as cutting indications. I know how to use cutting-indications for images i print without a border)
(i do not whant to use workarounds, the kind of preparing "identity plates", a new one each for infinite variations of proportions to use as fullblown-up backgrounds..)