Feb 25, 2012Can you show the direction of swing in the door schedule?
View 4 RepliesCan you show the direction of swing in the door schedule?
View 4 RepliesI downloaded a toilet stall that looks pretty good. But the door swing is on the wrong side for my plans.
Short of starting from scratch, is there a way to change the hinge side? Some restrooms have the hinge on the right side and others on the left. I'd like to be able to change this via a parameter. If I could figure out how, I'd add the param to the family. URL>...
I would like to add a automatic property set definition for door "swingdirection" in my door schedule and replace the “left” with LH, “right” with RH and if neither (N/A) with DBL (for double leaf doors).
I thought I remembered being able to view source code in 2004 ADA for how to change and replace but I’m lost in 2013.
How can the dimensions for the system family door be shown in the door schedule?
I tried to make a instance paramater, type parameter, both through shared parameter for the doors in the family file, but they are still not showing up.
I am currently running Revit Architecture 2011. I have interior elevations in my project, which include doors. The door swing lines show up solid in elevation. In fact there actually appear to be two of them. I want the elevation swing indication to be a center line style.
I have changed the swing elevation line type in object types to center (which is what I want).
I go to the elevations and there is no change in the swing indication line except that there still appear to be two lines (one on top of the other) where now one is center linetype and the other is solid. Seems like progress except that there is no actual visual difference.
There is only one symbolic line in the family. If I un-check the draw in foreground box the elevation line disapears entirely when reloaded into the project.
This is an OTB door. I can place it in a completely new template and it displays fine. So it I am thinking it is NOT the family. There must be some setting in the actual file itself controlling this and I am stumped.
I am trying to add the typical category of "glazing" to a door schedule, but when I add a door with glass into my project, I cannot make this information show up on my schedule. I need typical information such as "!/4" Temp" and "1" Insul" under the category of glazing. I added the "Door: Glass" heading in the schedule, but nothing appears when I add a glass door into the project. I was able to easily do this in AutoCAD Architecture.
View 5 Replies View RelatedSo I've created a door schedule and added all the parameters I needed. But to get the "room name" to list and be associated with the door tags I had to choose either if the doors were going to a room or from a room, so I chose to, however, some of the doors swing are leaving the room so instead of tagging them with the corridor we want them associated with the room. But I can't edit the column the room names are in. If I click on a cell it gives me a drop menu on the side of what I can choose for that cell and it doesn't have the listed room that I need. It does not let me just type in the cell is there a way to fix this?! The blue highlighted name shows my option of what I can list as the room name or I can leave it blank, it lets me click inside the cell as if I could just put text in it but it actually doesn't show anything that I type.
View 3 Replies View RelatedWhat kind of an instance paramater needs to be implemented in order to account the host wall type in the door schedule?
View 2 Replies View Related--Is there a way to do a door schedule by styles rather than individual door?
--To clarify: I want my door schedule to create a new door number only when one or more of the property sets, classifications, or door styles pertaining to a door are not defined by other doors in the schedule. This would facilitate giving the same door number to multiple doors that have matching schedule information, and cut down on my schedule size.
--how to do this. If I need to create custom tags, schedules, or formula properties.
I'm stuck on trying to draw the swing of a door. I know it's something simple but it's got me !!
View 9 Replies View RelatedI would like to add a door to the model but show the top view as a door swing.
View 7 Replies View RelatedI am having a little trouble with some doors showing up on the level 1 door schedule that are actually on level 2. They are curtain wall doors.
View 6 Replies View RelatedI am trying to get the door swing arc to scale correctly as the width of the box is changed.
But the block is defying logic by scaling the arc radius exactly 5 units short of what it should be.
I've tried deleting, recreating, and chaining the parameter over and over only to have the same problem each time.
I need to make the door schedule have the room name in it. I am using the project based door tag so it is already numbered like the room tag.
View 2 Replies View RelatedHow do I assign a door tag to a facade door element?
View 2 Replies View RelatedI am having trouble trying to edit the title fonts in a door schedule. No matter which font I pick under "Edit Schedule Table Style" after a selection of the schedule and right clik, the title font will not change. The listed doors font does change. Is it not poosible to change the title and descriptor font?
View 1 Replies View Relatedhow to link a door frames width and height to the door schedule? For example if I have a 3'-0" x7'-0" door the frame width would be 3'-4"x7'-2", I would like this to automatically generate in my door schedule when I insert a door without me having to manually put it in. I am using AutoCAD Architecture 2010.
View 6 Replies View RelatedWhen I flip a door from left to right side can I see changes in schedule table? I can't fin a parameter for swing orientation.
View 8 Replies View RelatedIs there a way to have more than 4 filters for a schedule?
View 2 Replies View RelatedI can create structural column schedule but i cant create for architectural columns.i wonder that i do something wrong or simply i cant be done?
View 1 Replies View RelatedIs there a way to add new parameters to revision schedule
View 2 Replies View RelatedIs it possible to control if the door tags is displayed by the schedules?
View 4 Replies View RelatedIs there a way to add additional filters to a schedule? I have a sheet list that needs a total of 6 filters.
View 1 Replies View Relatedhow to do the parameters of Schedule/Quantities.
View 9 Replies View RelatedHow to export a schedule from Revit to Excel,
I’m wondering if there is a way to export schedule from Revit to Excel..
We have a custom built schedule which has the typical "Comments" field. As we aork in our project and add items to that particular row, the "Comments" field gets reset to be blank.
What we are trying to do in effect is to establish a reference point so the we know where we are in relative to the reference point.
Is there a way to make the "Comments" field stick?
is there any way to schedule objects by id number?, maybe through a formula within the schedule that may call the id or the revit API and if that is the case
View 2 Replies View RelatedI've been trying to style my sheet list schedule. ... trying.Is it true that I can't
* style (fontsize, fontweight etc) a 'sorting header'?
* style the scheduleborder to only underline the sheetlist-rows
* seperate the header styles from sheetlist styles? (I don't want the header to have a border.... while sheetlist-row should be underlined)
* format the height of a row
I am having trouble creating my own column and beam
structural column schedule
structural framing schedule
i do not know the settings to be ticked for me to create the schedules and make them appear after i create new scheduling...
also i want to know how the graphical column and beam works...
then setting the level in the schedule to make them reflect instead of using the comments section...
Attach here is a screenshot of the levels...
Here is the end of the journal file:
'***********************************************************
'CT [Modifier la nomenclature ou les quantités]:
'{1} Dialog_Revit_ScheduleBar_a
'{458} Dialog_Revit_ScheduleBar_b
'{458} Dialog_Revit_ScheduleBar_c
'{458} Dialog_Revit_ScheduleBar_d
'{458} Dialog_Revit_ScheduleBar_e
[code]....
Revision schedule sorting improperly? For some reason it seems this particular schedule is sorting by month and ignoring the year.
View 2 Replies View Related