Apr 9, 2013Is it possible to control if the door tags is displayed by the schedules?
View 4 RepliesIs it possible to control if the door tags is displayed by the schedules?
View 4 RepliesI placed doors throughout my plan, but the door tags do not show. How do I turn them on and off for doors window etc.?
View 4 Replies View RelatedIs there a way to turn off all section tags for drawings refering to all Sketch Layouts in all the Construction Document Layouts?
View 4 Replies View RelatedI am having trouble creating custom schedule tags. I have followed the tutorial "to create a schedule tag", but it does not work for me. First off it is not annotative, I created it in 1 to 1 scale and checked the plotting scale to ensure it is 1 to 1.
Also, it creates the block, and I get it into the tool pallet, but when selected, it just inserts a block. I am trying to create a door tag, so when I select it from the tool pallet, it does not ask me to select a door to tag, just inserts the block.
The tag I want to create is very simple, I want to modify the OTTB Door Tag - Project Based, to remove the suffix and center the door number.
how to get the annotative scale to work with schedule tags.When I use attributes in blocks I draw the attribute definition with a height that I wish it to display in PaperSpace. Then when defining the block I select the annotative scale so that the block and text display correctly in any viewport.
However when I create Scheduling Tags using the Create Tags button on the Annotate/Scheduling tab it shrinks the text by 1/8" as soon as the tag is created. I've made sure that the scales are set to 1:1 when I create it. I guess I can just enlarge the text 8 times before I make the Tag.
Is there any way to get Revit window tags to behave like the door tags? The door tags seem to be instance parameters while the window tags are type parameters. I would like to use separate numbers for each window even though they are the same type. This would allow me to specify header required for each window in the schedule. I understand that I could edit the window families and save them as different files but this is time consuming. Is there an easier way?
View 3 Replies View RelatedIs there a way to have more than 4 filters for a schedule?
View 2 Replies View RelatedHow do I turn off the keyword tag "Smart tags"? I do not want an automate Smart tags on my images.
View 1 Replies View RelatedI can create structural column schedule but i cant create for architectural columns.i wonder that i do something wrong or simply i cant be done?
View 1 Replies View RelatedIs there a way to add new parameters to revision schedule
View 2 Replies View RelatedIs there a way to add additional filters to a schedule? I have a sheet list that needs a total of 6 filters.
View 1 Replies View Relatedhow to do the parameters of Schedule/Quantities.
View 9 Replies View RelatedHow to export a schedule from Revit to Excel,
I’m wondering if there is a way to export schedule from Revit to Excel..
We have a custom built schedule which has the typical "Comments" field. As we aork in our project and add items to that particular row, the "Comments" field gets reset to be blank.
What we are trying to do in effect is to establish a reference point so the we know where we are in relative to the reference point.
Is there a way to make the "Comments" field stick?
is there any way to schedule objects by id number?, maybe through a formula within the schedule that may call the id or the revit API and if that is the case
View 2 Replies View RelatedI've been trying to style my sheet list schedule. ... trying.Is it true that I can't
* style (fontsize, fontweight etc) a 'sorting header'?
* style the scheduleborder to only underline the sheetlist-rows
* seperate the header styles from sheetlist styles? (I don't want the header to have a border.... while sheetlist-row should be underlined)
* format the height of a row
I am trying to add the typical category of "glazing" to a door schedule, but when I add a door with glass into my project, I cannot make this information show up on my schedule. I need typical information such as "!/4" Temp" and "1" Insul" under the category of glazing. I added the "Door: Glass" heading in the schedule, but nothing appears when I add a glass door into the project. I was able to easily do this in AutoCAD Architecture.
View 5 Replies View RelatedI am having trouble creating my own column and beam
structural column schedule
structural framing schedule
i do not know the settings to be ticked for me to create the schedules and make them appear after i create new scheduling...
also i want to know how the graphical column and beam works...
then setting the level in the schedule to make them reflect instead of using the comments section...
Attach here is a screenshot of the levels...
Here is the end of the journal file:
'***********************************************************
'CT [Modifier la nomenclature ou les quantités]:
'{1} Dialog_Revit_ScheduleBar_a
'{458} Dialog_Revit_ScheduleBar_b
'{458} Dialog_Revit_ScheduleBar_c
'{458} Dialog_Revit_ScheduleBar_d
'{458} Dialog_Revit_ScheduleBar_e
[code]....
Revision schedule sorting improperly? For some reason it seems this particular schedule is sorting by month and ignoring the year.
View 2 Replies View RelatedI am fairly new to my current employment. Their default for door thickness in the schedule does not suppress zero feet. Every dimension under the thickness column reads 0'-2" instead of just 2" or whatever the thickness may be. I could just make a new parameter, but I was hoping to edit the current thickness parameter.
View 3 Replies View Relatedhow to create a wall schedule with areas. To find out how much plasterboard, paint etc. I need for a building.
View 1 Replies View RelatedSo I've created a door schedule and added all the parameters I needed. But to get the "room name" to list and be associated with the door tags I had to choose either if the doors were going to a room or from a room, so I chose to, however, some of the doors swing are leaving the room so instead of tagging them with the corridor we want them associated with the room. But I can't edit the column the room names are in. If I click on a cell it gives me a drop menu on the side of what I can choose for that cell and it doesn't have the listed room that I need. It does not let me just type in the cell is there a way to fix this?! The blue highlighted name shows my option of what I can list as the room name or I can leave it blank, it lets me click inside the cell as if I could just put text in it but it actually doesn't show anything that I type.
View 3 Replies View RelatedWhen splitting a schedule, the title of the schedule shows up above each of the columns created. Is there a way of having it so that when you slit a schedule in multiple columns, the title centeres over the entire view and shows itself only once instead of once over each column?
View 2 Replies View RelatedI want to be able to add rooms through the schedule prior to placing them in the model. I thought I would be able to do that by going to the Modify Schedule/ Quanties Tab and clicking New in the Rows columns but the new option is blanked out and not selectable.
View 5 Replies View RelatedIs there a way to have one schedule to tabulate the materials (by area, volume and length) as well as windows and doors (by pieces)?
View 1 Replies View RelatedWe have tested the difference between wall material take off and material part take off of the same wall.the wall consist of 20mm render, 230mm brick and 30mm tile. Both give the same result.If we join a beam with the wall however, the wall material take off will give different result than the material part take off.The wall finishes in the material part schedule are correct, the ones in the wall matrial take off are off by 53%.
Please see attached file and "unjoin" the beam to the wall to see that both quantities are the same.Interestingly, the total volume of both schedules is almost identical, it is the subdivision that is completely off.
When setting up the material take off manually the material part take off is correct.I suspect I do something wrong. 53% off is not even usable when doing concept.
I know how to edit the appearance of a schedule for a sheet. What I am looking for is how to increase the text size of a schedule while you are editing it.
View 2 Replies View RelatedHow to configure the schedule synchronization between Host and Accelerator of Revit Server 2013
View 2 Replies View RelatedThe window type showed up in the window schedule. But the window dimension didn't.
What's the reason of it? I know you can enter the dimension directly into the schedule. But it would be nice if it comes it automatically. See attached file.
I have certain parameters I'm using in a Door Schedule that should offer a drop-down list of options. When I click in the schedule cell to make a change, I don't get the drop-down. If I select the same door element in the model (such as in a Floor Plan view), I get the drop-down in the Properties window.
One parameter is a Shared Parameter, which is Instance-Based called "Panel Type", and is the "<Family Type...>" kind of parameter. The other troublesome parameter is a Project Parameter from a Schedule Key (Key Name) for a predefined list of Hardware options. Again, the drop-down box doesn't appear in the schedule cell but does appear in a model view on the Properties window.
Strange enough, if I create a new Door Schedule from scratch and add these same two parameters, the schedule behaves properly and offers the drop-down box.
why these drop-down boxes might get "locked out" in the schedule? I don't mind re-creating my Schedule once, but I'd prefer to understand what and why Revit is behaving this way to avoid this in the future.