Revit :: Dimensions Don't Show Up In Window Schedule?

Aug 8, 2012

The window type showed up in the window schedule.  But the window dimension didn't.
 
What's the reason of it?  I know you can enter the dimension directly into the schedule.  But it would be nice if it comes it automatically.  See attached file.

View 2 Replies


ADVERTISEMENT

Revit :: How To Show Dimensions For Window In Plan

Apr 27, 2012

How to show dimensions for window in plan , instead of default hexagon  (number)
 
For example 60" x 48"

View 2 Replies View Related

Revit :: How To Round Dimensions In The Schedule To Nearest Inch

Aug 15, 2011

I'm trying to create an accurate door schedule.  I have curtain wall doors but on the schedule it rounds them to 1/16" How can I round the dimensions in the schedule to the nearest inch instead?

View 3 Replies View Related

Revit :: Door Schedule - Show Host Wall Type?

Jan 3, 2012

What kind of an instance paramater needs to be implemented in order to account the host wall type in the door schedule?

View 2 Replies View Related

Revit :: System Family Door Dimensions In Door Schedule

Jan 3, 2012

How can the dimensions for the system family door be shown in the door schedule?
 
I tried to make a instance paramater, type parameter, both through shared parameter for the doors in the family file, but they are still not showing up.

View 3 Replies View Related

Revit :: Temporary Dimensions Do Not Show?

Nov 5, 2013

I am using Revit 2014.  My temporary dimensions do not show.  When they do, they only show on one side.  I have gone to Manage>Additional Settings>Temporary Dimensions, and tried the different options.  It is making it very difficult to place things right now.  Is there an all on button I can push?  I have also tried closing and re-opening the file, turning off the computer, etc.  They were available for use yesterday morning and have not worked since. 

View 3 Replies View Related

Revit :: How To Show Information On Properties Palette Under Dimensions

Jul 25, 2013

Is there any way to turn on the information ,which can be obtained from schedules, on properties palette? For example, the length for the structural columns can be seen on the schedule created. However, it is not seen on the properties palette. How can I show that information on properties palette under dimensions?

View 1 Replies View Related

Revit :: How To Set View Range To Show A Window

Aug 31, 2012

How do you set the view range to show a window with a sill height of 5'-0" and a dog door with a head height of 2' in the same wall on a floor plan view?

View 3 Replies View Related

Revit :: How To Show Dimensions For Any Room In Plan / Instead Of Default Area

Apr 27, 2012

how to show dimensions for any room in plan , instead of default Area (SQ FT)
 
For example ....BEDROOM   10' 3" x 10' 0"

View 2 Replies View Related

AutoCAD Architecture :: How To Show Space Style In The Schedule

Nov 24, 2009

I am having a problem with project based door tags getting the *ERROR GETTING VALUE*. I have checked the synchronizations and they are fine. The tags work in all our other projects, just not this one. We are also having some problems with a ? showing up for a space style in the schedule.

View 8 Replies View Related

Revit :: Have More Than 4 Filters For Schedule?

Dec 30, 2011

Is there a way to have more than 4 filters for a schedule?

View 2 Replies View Related

Revit :: Possible To Create Column Schedule?

Aug 6, 2011

I can create  structural column schedule but i cant create for architectural columns.i wonder that i do something wrong or simply i cant be done?

View 1 Replies View Related

Revit :: How To Add New Parameters To Revision Schedule

Feb 22, 2012

Is there a way to add new parameters to revision schedule

View 2 Replies View Related

Revit :: Turn Tags On / Off From Schedule

Apr 9, 2013

Is it possible to control if the door tags is displayed by the schedules?

View 4 Replies View Related

Revit :: How To Add Additional Filters To A Schedule

Oct 7, 2011

Is there a way to add additional filters to a schedule? I have a sheet list that needs a total of 6 filters. 

View 1 Replies View Related

Revit :: How To Do Parameters Of Schedule / Quantities

Dec 7, 2013

how to do the parameters of Schedule/Quantities.

View 9 Replies View Related

Revit :: How To Export A Schedule To Excel

Nov 2, 2012

How to export a schedule from Revit to Excel,
 
I’m wondering if there is a way to export schedule from Revit to Excel..

View 2 Replies View Related

Revit :: Disappearing Schedule Comments?

Feb 28, 2013

We have a custom built schedule which has the typical "Comments" field.  As we aork in our project and add items to that particular row, the "Comments" field gets reset to be blank.  
 
What we are trying to do in effect is to establish a reference point so the we know where we are in relative to the reference point.
 
Is there a way to make the "Comments" field stick?

View 1 Replies View Related

Revit :: Schedule Objects By Id Number?

Jul 18, 2008

is there any way to schedule objects by id number?, maybe through a formula within the schedule that may call the id or the revit API and if that is the case

View 2 Replies View Related

Revit :: Style Sheet List Schedule

Nov 7, 2011

I've been trying to style my sheet list schedule. ... trying.Is it true that I can't

* style (fontsize, fontweight etc) a 'sorting header'?
* style the scheduleborder to only underline the sheetlist-rows
* seperate the header styles from sheetlist styles? (I don't want the header to have a border.... while sheetlist-row should be underlined)
* format the height of a row

View 2 Replies View Related

Revit :: Scheduling Glazing In Door Schedule?

May 29, 2013

I am trying to add the typical category of "glazing" to a door schedule, but when I add a door with glass into my project, I cannot make this information show up on my schedule.  I need typical information such as "!/4" Temp" and "1" Insul" under the category of glazing.  I added the "Door: Glass" heading in the schedule, but nothing appears when I add a glass door into the project. I was able to easily do this in AutoCAD Architecture.

View 5 Replies View Related

Revit :: Structural Column And Framing Schedule

Jul 15, 2012

I am having trouble creating my own column and beam
 
structural column schedule
structural framing schedule
 
i do not know the settings to be ticked for me to create the schedules and make them appear after i create new scheduling...
 
also i want to know how the graphical column and beam works...
 
then setting the level in the schedule to make them reflect instead of using the comments section...
 
Attach here is a screenshot of the levels...

View 3 Replies View Related

Revit :: 2013 Crash When Opening A Schedule

Mar 28, 2013

Here is the end of the journal file:
 
'***********************************************************
'CT [Modifier la nomenclature ou les quantités]:
'{1} Dialog_Revit_ScheduleBar_a
'{458} Dialog_Revit_ScheduleBar_b
'{458} Dialog_Revit_ScheduleBar_c
'{458} Dialog_Revit_ScheduleBar_d
'{458} Dialog_Revit_ScheduleBar_e

[code]....

View 1 Replies View Related

Revit :: Revision Schedule Not Sorting By Date

May 22, 2013

Revision schedule sorting improperly? For some reason it seems this particular schedule is sorting by month and ignoring the year.

View 2 Replies View Related

Revit :: Schedule Doesn't Suppress Zero Feet

Apr 3, 2013

I am fairly new to my current employment.  Their default for door thickness in the schedule does not suppress zero feet. Every dimension under the thickness column reads 0'-2" instead of just 2" or whatever the thickness may be. I could just make a new parameter, but I was hoping to edit the current thickness parameter.

View 3 Replies View Related

Revit :: How To Create Wall Schedule With Areas

May 22, 2012

how to create a wall schedule with areas. To find out how much plasterboard, paint etc. I need for a building.

View 1 Replies View Related

Revit :: Editing Cells Within A Door Schedule

Apr 19, 2013

So I've created a door schedule and added all the parameters I needed.  But to get the "room name" to list and be associated with the door tags I had to choose either if the doors were going to a room or from a room, so I chose to, however, some of the doors swing are leaving the room so instead of tagging them with the corridor we want them associated with the room.  But I can't edit the column the room names are in. If I click on a cell it gives me a drop menu on the side of what I can choose for that cell and it doesn't have the listed room that I need.  It does not let me just type in the cell is there a way to fix this?! The blue highlighted name shows my option of what I can list as the room name or I can leave it blank, it lets me click inside the cell as if I could just put text in it but it actually doesn't show anything that I type.

View 3 Replies View Related

Revit :: Splitting Schedule In Multiple Columns

Feb 16, 2014

When splitting a schedule, the title of the schedule shows up above each of the columns created. Is there a way of having it so that when you slit a schedule in multiple columns, the title centeres over the entire view and shows itself only once instead of once over each column?

View 2 Replies View Related

Revit :: Adding Rooms Through Room Schedule?

Jan 28, 2014

I want to be able to add rooms through the schedule prior to placing them in the model. I thought I would be able to do that by going to the Modify Schedule/ Quanties Tab and clicking New in the Rows columns but the new option is blanked out and not selectable.

View 5 Replies View Related

Revit :: One Schedule For Materials And Doors / Windows?

Dec 19, 2011

Is there a way to have one schedule to tabulate the materials (by area, volume and length) as well as windows and doors (by pieces)?

View 1 Replies View Related

Revit :: Discrepancy Between Part And Material Schedule

Mar 19, 2013

We have tested the difference between wall material take off and material part take off of the same wall.the wall consist of 20mm render, 230mm brick and 30mm tile. Both give the same result.If we join a beam with the wall however, the wall material take off will give different result than the material part take off.The wall finishes in the material part schedule are correct, the ones in the wall matrial take off are off by 53%.
 
Please see attached file and "unjoin" the beam to the wall to see that both quantities are the same.Interestingly, the total volume of both schedules is almost identical, it is the subdivision that is completely off.
 
When setting up the material take off manually the material part take off is correct.I suspect I do something wrong. 53% off is not even usable when doing concept.

View 7 Replies View Related