So I've created a door schedule and added all the parameters I needed.  But to get the "room name" to list and be associated with the door tags I had to choose either if the doors were going to a room or from a room, so I chose to, however, some of the doors swing are leaving the room so instead of tagging them with the corridor we want them associated with the room.  But I can't edit the column the room names are in. If I click on a cell it gives me a drop menu on the side of what I can choose for that cell and it doesn't have the listed room that I need.  It does not let me just type in the cell is there a way to fix this?! The blue highlighted name shows my option of what I can list as the room name or I can leave it blank, it lets me click inside the cell as if I could just put text in it but it actually doesn't show anything that I type.

View 3 Replies


ADVERTISEMENT

Revit :: System Family Door Dimensions In Door Schedule

Jan 3, 2012

How can the dimensions for the system family door be shown in the door schedule?
 
I tried to make a instance paramater, type parameter, both through shared parameter for the doors in the family file, but they are still not showing up.

View 3 Replies View Related

Revit :: Scheduling Glazing In Door Schedule?

May 29, 2013

I am trying to add the typical category of "glazing" to a door schedule, but when I add a door with glass into my project, I cannot make this information show up on my schedule.  I need typical information such as "!/4" Temp" and "1" Insul" under the category of glazing.  I added the "Door: Glass" heading in the schedule, but nothing appears when I add a glass door into the project. I was able to easily do this in AutoCAD Architecture.

View 5 Replies View Related

Revit :: Door Schedule - Direction Of Swing

Feb 25, 2012

Can you show the direction of swing in the door schedule?

View 4 Replies View Related

Revit :: Door Schedule - Show Host Wall Type?

Jan 3, 2012

What kind of an instance paramater needs to be implemented in order to account the host wall type in the door schedule?

View 2 Replies View Related

AutoCAD Architecture :: Do A Door Schedule By Styles Rather Than Individual Door

Apr 29, 2004

--Is there a way to do a door schedule by styles rather than individual door?

--To clarify: I want my door schedule to create a new door number only when one or more of the property sets, classifications, or door styles pertaining to a door are not defined by other doors in the schedule. This would facilitate giving the same door number to multiple doors that have matching schedule information, and cut down on my schedule size.

--how to do this. If I need to create custom tags, schedules, or formula properties.

View 9 Replies View Related

Revit :: Text Size While Editing Schedule

Dec 13, 2012

I know how to edit the appearance of a schedule for a sheet. What I am looking for is how to increase the text size of a schedule while you are editing it.

View 2 Replies View Related

Revit :: Level 2 Doors Showing Up On Level 1 Door Schedule

Jul 16, 2007

I am having a little trouble with some doors showing up on the level 1 door schedule that are actually on level 2. They are curtain wall doors.

View 6 Replies View Related

AutoCAD Architecture :: Make Door Schedule Having Room Name

Mar 6, 2011

I need to make the door schedule have the room name in it. I am using the project based door tag so it is already numbered like the room tag.

View 2 Replies View Related

Revit :: Assign Door Tag To Facade Door Element

Dec 22, 2011

How do I assign a door tag to a facade door element?

View 2 Replies View Related

AutoCAD Architecture :: Edit Door Schedule Title Font?

Aug 7, 2011

I am having trouble trying to edit the title fonts in a door schedule.  No matter which font I pick under "Edit Schedule Table Style" after a selection of the schedule and right clik, the title font will not change.  The listed doors font does change.  Is it not poosible to change the title and descriptor font?

View 1 Replies View Related

AutoCAD Architecture :: Link Frames Width And Height To Door Schedule?

Oct 17, 2012

how to link a door frames width and height to the door schedule?  For example if I have a 3'-0" x7'-0" door the frame width would be 3'-4"x7'-2", I would like this to automatically generate in my door schedule when I insert a door without me having to manually put it in.  I am using AutoCAD Architecture 2010.

View 6 Replies View Related

AutoCAD 2010 :: Editing Text In Table Cells

Mar 7, 2012

I've started having problems when trying to edit text in table cells. Sometimes I double click and all is ok. Sometimes it wont let me select anything in the cell. Sometimes I have to select the cell, then right click to edit text. I get this message:

Command: Specify opposite corner:
Invalid window specification.
Specify opposite corner: Specify opposite corner:

Is this likely to be a hardwear issue, and the pc is struggling to run AC correctly with all the other crap my company has running in the background? Or is there a systems setting that may have been changed, for whatever reason?

View 4 Replies View Related

Revit :: Have More Than 4 Filters For Schedule?

Dec 30, 2011

Is there a way to have more than 4 filters for a schedule?

View 2 Replies View Related

Revit :: Possible To Create Column Schedule?

Aug 6, 2011

I can create  structural column schedule but i cant create for architectural columns.i wonder that i do something wrong or simply i cant be done?

View 1 Replies View Related

Revit :: How To Add New Parameters To Revision Schedule

Feb 22, 2012

Is there a way to add new parameters to revision schedule

View 2 Replies View Related

Revit :: Turn Tags On / Off From Schedule

Apr 9, 2013

Is it possible to control if the door tags is displayed by the schedules?

View 4 Replies View Related

Revit :: How To Add Additional Filters To A Schedule

Oct 7, 2011

Is there a way to add additional filters to a schedule? I have a sheet list that needs a total of 6 filters. 

View 1 Replies View Related

Revit :: How To Do Parameters Of Schedule / Quantities

Dec 7, 2013

how to do the parameters of Schedule/Quantities.

View 9 Replies View Related

Revit :: How To Export A Schedule To Excel

Nov 2, 2012

How to export a schedule from Revit to Excel,
 
I’m wondering if there is a way to export schedule from Revit to Excel..

View 2 Replies View Related

Revit :: Disappearing Schedule Comments?

Feb 28, 2013

We have a custom built schedule which has the typical "Comments" field.  As we aork in our project and add items to that particular row, the "Comments" field gets reset to be blank.  
 
What we are trying to do in effect is to establish a reference point so the we know where we are in relative to the reference point.
 
Is there a way to make the "Comments" field stick?

View 1 Replies View Related

Revit :: Schedule Objects By Id Number?

Jul 18, 2008

is there any way to schedule objects by id number?, maybe through a formula within the schedule that may call the id or the revit API and if that is the case

View 2 Replies View Related

Revit :: Style Sheet List Schedule

Nov 7, 2011

I've been trying to style my sheet list schedule. ... trying.Is it true that I can't

* style (fontsize, fontweight etc) a 'sorting header'?
* style the scheduleborder to only underline the sheetlist-rows
* seperate the header styles from sheetlist styles? (I don't want the header to have a border.... while sheetlist-row should be underlined)
* format the height of a row

View 2 Replies View Related

Revit :: Structural Column And Framing Schedule

Jul 15, 2012

I am having trouble creating my own column and beam
 
structural column schedule
structural framing schedule
 
i do not know the settings to be ticked for me to create the schedules and make them appear after i create new scheduling...
 
also i want to know how the graphical column and beam works...
 
then setting the level in the schedule to make them reflect instead of using the comments section...
 
Attach here is a screenshot of the levels...

View 3 Replies View Related

Revit :: 2013 Crash When Opening A Schedule

Mar 28, 2013

Here is the end of the journal file:
 
'***********************************************************
'CT [Modifier la nomenclature ou les quantités]:
'{1} Dialog_Revit_ScheduleBar_a
'{458} Dialog_Revit_ScheduleBar_b
'{458} Dialog_Revit_ScheduleBar_c
'{458} Dialog_Revit_ScheduleBar_d
'{458} Dialog_Revit_ScheduleBar_e

[code]....

View 1 Replies View Related

Revit :: Revision Schedule Not Sorting By Date

May 22, 2013

Revision schedule sorting improperly? For some reason it seems this particular schedule is sorting by month and ignoring the year.

View 2 Replies View Related

Revit :: Schedule Doesn't Suppress Zero Feet

Apr 3, 2013

I am fairly new to my current employment.  Their default for door thickness in the schedule does not suppress zero feet. Every dimension under the thickness column reads 0'-2" instead of just 2" or whatever the thickness may be. I could just make a new parameter, but I was hoping to edit the current thickness parameter.

View 3 Replies View Related

Revit :: How To Create Wall Schedule With Areas

May 22, 2012

how to create a wall schedule with areas. To find out how much plasterboard, paint etc. I need for a building.

View 1 Replies View Related

Revit :: Splitting Schedule In Multiple Columns

Feb 16, 2014

When splitting a schedule, the title of the schedule shows up above each of the columns created. Is there a way of having it so that when you slit a schedule in multiple columns, the title centeres over the entire view and shows itself only once instead of once over each column?

View 2 Replies View Related

Revit :: Adding Rooms Through Room Schedule?

Jan 28, 2014

I want to be able to add rooms through the schedule prior to placing them in the model. I thought I would be able to do that by going to the Modify Schedule/ Quanties Tab and clicking New in the Rows columns but the new option is blanked out and not selectable.

View 5 Replies View Related

Revit :: One Schedule For Materials And Doors / Windows?

Dec 19, 2011

Is there a way to have one schedule to tabulate the materials (by area, volume and length) as well as windows and doors (by pieces)?