Revit :: Getting Each Type Of Light To Only Be Listed On Schedule Once?

Aug 11, 2011

I would like each type of light to only be listed on the schedule once.  The schedules seem really unstable, everytime I look at it the whole thing has changed. There are so many extra items listed and I don't know where they came from. The mark numbers are weird like AAAA, AAAAAA, BBBB, BBBBB. I don't know how these got added or why they have such strange marks.

View 4 Replies


ADVERTISEMENT

Revit :: Create Schedule That Figures Out Light Power Density For Each Room?

Sep 16, 2011

I am trying to create a Schedule that figures out Light Power density for each room. The first issue is getting Lights to register what room they are located in. The next issue is getting the room area parameter to show up in the available fields. It is funny b/c Volume shows up but not the room area. How hard could that have to been to add that to the available list since volume is there.

View 1 Replies View Related

Revit :: Filter Wall Schedule By Type?

Jun 8, 2010

I am trying to make a schedule and I need to schedule walls, and filter by type.  But this option is not available in the view properites/filter options in the schedule.
 
Is it possible to make this happen without creating an additional parameter for filtering?  Which would also open up the potential for omissions in the schedule.

View 5 Replies View Related

Revit :: Door Schedule - Show Host Wall Type?

Jan 3, 2012

What kind of an instance paramater needs to be implemented in order to account the host wall type in the door schedule?

View 2 Replies View Related

Revit :: Can Ceiling Type Be Linked To Room Finish Schedule

Feb 8, 2013

In a recent meeting wtih cilent, we asked her to review the Finish Schedule.  She pointed out that one of the ceilings was supposed to be gypsum board rather than ACT.  Looking on our RCP, it was showing gyp board, but the schedule, which is populated from the Room Properties, was calling out  (the non-updated) ACT 2x2. 
 
Is there some way to link the ceiling type directly to the finish schedule directly, rather than make double changes (updating the room properties and the actual ceiling type) in order for the proper information to be showing?  Seems odd and not very useful to have this kind of redundancy and something that should have been worked out long ago in Revit.

View 1 Replies View Related

Revit :: Change Font Type And Size Of Level Inside Schedule?

Jul 10, 2012

Is there a way to change the font type and size of the Level within the schedule?

View 1 Replies View Related

Revit :: How To Get Light To Cut The Floor Out So Can See Light When Rendered

Dec 6, 2010

How do I use the standard Revit can lights in a wood joist floor with drywall applied to the bottom?  If I place in a suspended ceiling, can lights light up just fine.  However, if I use them in the floor space of a wood joist floor, the light itself gets covered with the floor.  How can I get the light to cut the floor out so I can see the light when it is rendered?

View 4 Replies View Related

Revit :: Have More Than 4 Filters For Schedule?

Dec 30, 2011

Is there a way to have more than 4 filters for a schedule?

View 2 Replies View Related

Photoshop :: Light Shining Through Type

Mar 7, 2008

i'm currently working on a design that requires a 3D rending of a logo with light shining through the type. i tried using the lighting effects in the render filter but i doesn't give the effect that the client requests. i hope i'm not being too vague. its requested that the light be seeping through the type with the letter forms just outlined.

View 1 Replies View Related

Revit :: Possible To Create Column Schedule?

Aug 6, 2011

I can create  structural column schedule but i cant create for architectural columns.i wonder that i do something wrong or simply i cant be done?

View 1 Replies View Related

Revit :: How To Add New Parameters To Revision Schedule

Feb 22, 2012

Is there a way to add new parameters to revision schedule

View 2 Replies View Related

Revit :: Turn Tags On / Off From Schedule

Apr 9, 2013

Is it possible to control if the door tags is displayed by the schedules?

View 4 Replies View Related

Revit :: How To Add Additional Filters To A Schedule

Oct 7, 2011

Is there a way to add additional filters to a schedule? I have a sheet list that needs a total of 6 filters. 

View 1 Replies View Related

Revit :: How To Do Parameters Of Schedule / Quantities

Dec 7, 2013

how to do the parameters of Schedule/Quantities.

View 9 Replies View Related

Revit :: How To Export A Schedule To Excel

Nov 2, 2012

How to export a schedule from Revit to Excel,
 
I’m wondering if there is a way to export schedule from Revit to Excel..

View 2 Replies View Related

Revit :: Disappearing Schedule Comments?

Feb 28, 2013

We have a custom built schedule which has the typical "Comments" field.  As we aork in our project and add items to that particular row, the "Comments" field gets reset to be blank.  
 
What we are trying to do in effect is to establish a reference point so the we know where we are in relative to the reference point.
 
Is there a way to make the "Comments" field stick?

View 1 Replies View Related

Revit :: Schedule Objects By Id Number?

Jul 18, 2008

is there any way to schedule objects by id number?, maybe through a formula within the schedule that may call the id or the revit API and if that is the case

View 2 Replies View Related

Revit :: Style Sheet List Schedule

Nov 7, 2011

I've been trying to style my sheet list schedule. ... trying.Is it true that I can't

* style (fontsize, fontweight etc) a 'sorting header'?
* style the scheduleborder to only underline the sheetlist-rows
* seperate the header styles from sheetlist styles? (I don't want the header to have a border.... while sheetlist-row should be underlined)
* format the height of a row

View 2 Replies View Related

Revit :: Scheduling Glazing In Door Schedule?

May 29, 2013

I am trying to add the typical category of "glazing" to a door schedule, but when I add a door with glass into my project, I cannot make this information show up on my schedule.  I need typical information such as "!/4" Temp" and "1" Insul" under the category of glazing.  I added the "Door: Glass" heading in the schedule, but nothing appears when I add a glass door into the project. I was able to easily do this in AutoCAD Architecture.

View 5 Replies View Related

Revit :: Structural Column And Framing Schedule

Jul 15, 2012

I am having trouble creating my own column and beam
 
structural column schedule
structural framing schedule
 
i do not know the settings to be ticked for me to create the schedules and make them appear after i create new scheduling...
 
also i want to know how the graphical column and beam works...
 
then setting the level in the schedule to make them reflect instead of using the comments section...
 
Attach here is a screenshot of the levels...

View 3 Replies View Related

Revit :: 2013 Crash When Opening A Schedule

Mar 28, 2013

Here is the end of the journal file:
 
'***********************************************************
'CT [Modifier la nomenclature ou les quantités]:
'{1} Dialog_Revit_ScheduleBar_a
'{458} Dialog_Revit_ScheduleBar_b
'{458} Dialog_Revit_ScheduleBar_c
'{458} Dialog_Revit_ScheduleBar_d
'{458} Dialog_Revit_ScheduleBar_e

[code]....

View 1 Replies View Related

Revit :: Revision Schedule Not Sorting By Date

May 22, 2013

Revision schedule sorting improperly? For some reason it seems this particular schedule is sorting by month and ignoring the year.

View 2 Replies View Related

Revit :: Schedule Doesn't Suppress Zero Feet

Apr 3, 2013

I am fairly new to my current employment.  Their default for door thickness in the schedule does not suppress zero feet. Every dimension under the thickness column reads 0'-2" instead of just 2" or whatever the thickness may be. I could just make a new parameter, but I was hoping to edit the current thickness parameter.

View 3 Replies View Related

Revit :: How To Create Wall Schedule With Areas

May 22, 2012

how to create a wall schedule with areas. To find out how much plasterboard, paint etc. I need for a building.

View 1 Replies View Related

Revit :: Editing Cells Within A Door Schedule

Apr 19, 2013

So I've created a door schedule and added all the parameters I needed.  But to get the "room name" to list and be associated with the door tags I had to choose either if the doors were going to a room or from a room, so I chose to, however, some of the doors swing are leaving the room so instead of tagging them with the corridor we want them associated with the room.  But I can't edit the column the room names are in. If I click on a cell it gives me a drop menu on the side of what I can choose for that cell and it doesn't have the listed room that I need.  It does not let me just type in the cell is there a way to fix this?! The blue highlighted name shows my option of what I can list as the room name or I can leave it blank, it lets me click inside the cell as if I could just put text in it but it actually doesn't show anything that I type.

View 3 Replies View Related

Revit :: Splitting Schedule In Multiple Columns

Feb 16, 2014

When splitting a schedule, the title of the schedule shows up above each of the columns created. Is there a way of having it so that when you slit a schedule in multiple columns, the title centeres over the entire view and shows itself only once instead of once over each column?

View 2 Replies View Related

Revit :: Adding Rooms Through Room Schedule?

Jan 28, 2014

I want to be able to add rooms through the schedule prior to placing them in the model. I thought I would be able to do that by going to the Modify Schedule/ Quanties Tab and clicking New in the Rows columns but the new option is blanked out and not selectable.

View 5 Replies View Related

Revit :: One Schedule For Materials And Doors / Windows?

Dec 19, 2011

Is there a way to have one schedule to tabulate the materials (by area, volume and length) as well as windows and doors (by pieces)?

View 1 Replies View Related

Revit :: Discrepancy Between Part And Material Schedule

Mar 19, 2013

We have tested the difference between wall material take off and material part take off of the same wall.the wall consist of 20mm render, 230mm brick and 30mm tile. Both give the same result.If we join a beam with the wall however, the wall material take off will give different result than the material part take off.The wall finishes in the material part schedule are correct, the ones in the wall matrial take off are off by 53%.
 
Please see attached file and "unjoin" the beam to the wall to see that both quantities are the same.Interestingly, the total volume of both schedules is almost identical, it is the subdivision that is completely off.
 
When setting up the material take off manually the material part take off is correct.I suspect I do something wrong. 53% off is not even usable when doing concept.

View 7 Replies View Related

Revit :: Text Size While Editing Schedule

Dec 13, 2012

I know how to edit the appearance of a schedule for a sheet. What I am looking for is how to increase the text size of a schedule while you are editing it.

View 2 Replies View Related

Revit :: Schedule Synchronization Between Host And Accelerator?

Sep 23, 2013

How to configure the schedule synchronization between Host and Accelerator of Revit Server 2013

View 2 Replies View Related