AutoCAD Civil 3D :: Nothing Appears As Stakeout Alignment Report Is Executed
Aug 10, 2013
Nothing appears as the “Stakeout Alignment Report” is executed,I wanted to execute the “Stakeout Alignment Report” (attached) but nothing appears! This is despite the fact that:
-The IE is set as default browser (attached)
-The Active X is enabled (attached)
How would I go about generating labelled points with xyz values at 5m intervals along a road alignment in Civils 3D 2014?
I have had a go with the AddAlign Labels command but could not figure out how to add an elevation value to the label. Also this method seems to require manual input for each label which is not practical as I will have have around 450 points to set out.
I have looked into the Stakeout Alignment Report, but this seems to require a survey database, which I don't have.
Is there a way to included the radial bearings of curves for alignment reports generated for the report manager? I know the curves are tangent because I made them so, but the guy checking my report for errors doesn't know that. I don't know any xml.
I am trying to export an Alignment PI Station Report. I've set all the settings I can find to round coordinates to 4 decimal places, Distance to 2 decimal places, and Direction to the nearest second (DMS). When I execute the PI Station Report, the Distance is 3 decimal places and the Direction is to the nearest 100th of a second. how to get these to the correct decimal place? I managed to change them to the correct decimal place for a Station & Curve Report, but not for the PI Station Report. Also, for the Northing/Easting coordinates, I want to remove the commas (for example, a Northing of 3,058,715.3774' should read 3058715.3774').
I have a 2 mile alignment of a railroad loop track and I am looking to generate a report that include both information at 50' increments and the curve data, i.e. PI, PT, so I can generate a staking report for the surveyors. I noticed that there are pre-canned reports that handle one or the other but not both.
i found a way to get a report of my cogo points relative to an alignment i.e. station offset. problem is, i have thousands of points in my drawing. is there a way to get only a few, or a group of points to show up on the report instead of ALL of them?
I am trying to create stakeout on grid in drawing wherein I wish to give details of X,Y coordinates along with Z (which will be volume comparison surface). I wish to display this information at every 5m interval on drawing. This can be useful for contractor for stakeout on site.
I tried using command thru "Points - Create Points, Suafec - On Grid" I did everything as directed on screen. However no information is getting displayed on screen. I am bit confused. I have made sure no layers are frozen and point style is also correct (i.e. it is not none). Still I don't see any information on screen.
Our team is doing program customization in Inventor 2011 that extract drawings based on 3D model. When the program runs and reached the line that has either open, close and save method, Inventor program automatically terminated and “Inventor Send Error Report” appears. When we tried to debug the program and when it reached the line that has either open, close, and save method, we force to exit our customized program but the same case, when it is totally terminated, Inventor program also terminated and “Inventor Send Error Report” appears. When we investigate the problem, we tried several solutions such as setting the active document to new variable, added a method to pause the program for few seconds, etc but still no effect. Our machine is using: Windows XP Pro x64 SP2 Intel Xeon(R), 6 GB RAM Is there a VBA for Inventor that is intended for 64 bit machine? Because I think we use 32 bit VBA in Inventor. What does “Inventor32bitHost.exe” means in task manager? Is there any relation to Inventor VBA?
I recently upgraded to Civil 3D 2011 from C3D2010. I have used the same ACAD.PGP file for years that includes the shortcut C for the COPY command. Up until C3D2011 this would always allow me to copy an entity multiple times, (the default when COPYMODE is set to 0).
I am running C3D2011 64bit on WIN 7 64bit OS. It happens with other commands too that use a dialog box normally, i.e. INSERT - it only brings up the command line version of it.
I using a data reference/shortcut to properly label an alignment in paperspace. However when I reference the alignment in and apply the labels the aren't the same as the original alignment that I am referencing. Is there a setting where I am supposed to apply a new beginning station.
Also it seems as though the stationing(distance) isn't even matching up 1:1 with the original drawing. For example in the original base drawing my alignment starts at 10+00 with the next PI at 14+76.98, but the stationing on the reference alignment starts at 0+83.33 with the very same PI being labeled as 1+23.08. So the very same distance is 476.98' in the real design and the drawing it's being referenced in, but the stationing of the referenced alignment shows it as 39.75 Units.
I've attached a screen of the beginning of the alignment.
Civil 3D 2012 Windows 7 Service Pack 1 Intel Core i7-2600 CPU 16GB RAM
Using Civil 3d2012, Is it possible to change the alignment label style set after the alignment has been created? For example, for an alignment that was created with alignment label set X - change the label set to alignment label set Y? It seems like this should be pretty easy, I must be missing something obvious.
I have a question on Alignment PI's. (Point of Inflection/Intersection)I have an alignment where some PI's have curves, others are merely hard bends.
Is there a way to automatically label the PI's even if they have an associated curve? (I'd like PI, PC and PT)Alternatively, can I only show markers at PI's without curves?
I’m wondering if there is a way to launch alignment grid view/alignment entities (attached) without the need to first launching “alignment”? This dialogue box is quite essential in editing the values of radius, degree of curvature and deflection angle for the selected curve.
Can I inherit the station from one alignment as the begin station for another alignment?
For example. Alignment 1 is 1000 ft long and starts at sta 0+00.
At sta 8+01, Alignment 2 begins and goes off in another direction.
I manually enter 8+01 for begin station Alignment 2. Life is good. Still in the design stage, and customer needs to modify Alignment 1 to avoid something. Now Alignment 2 intersects Alignment 1 at sta 8+15, but same N/E coordinates.
I manually enter 8+15 for begin station Alignment 2.
It would be better if Alignment 2 could inherit the begin station based on the new stationing from Alignment 1.
I'm need to make a Map Check report on C3D2011, but I don't know how to do it. Since C3D everything have to be setup before it can be use, so my questions are: How do I setup map check? Or What do I need to do get map check report?
I import a survey data (X,Y,Z) in civil3D and make an horizontal alignment near them. I want reference theses survey points to my new alignment by a .txt report (#pts CH. OS elevation). Is it possible?
Setting up my first press parts list and already I'm regretting it...
How do we report material? Lower case letters spelling ductile iron is not acceptable in this office. How to I edit this to be 'DI' or anything else? I have looked in the press part catalog editor or whatever it's called and did not see a way to add to the list of all lower case materials.
Do I have to rely sole on part description for material in labels? ....and why do they still think that no one needs to use the " symbol with these parts? Freakin crashing all morning tring to get this going...
I copied the General Legal Description report and renamed it. When I ran the report, it asked me to save the file Civil.html before opening it. If I run the OOTB report it does not ask me to save the page before opening it. Is this something that I can fix? I have not found a setting anywhere that changes this.
I would like to re-format the way volume reports are displayed, for example I don't need the cut area or reusable volume columns or I'd like to change the Cu.m. dimensional to something like m3.
First prize for me would be to be able to access Parcel boundary vertices via managed dot net.
I could not find the boundary property of the Parcel object.
It looks like developers can access Parcel vertices via COM, in the Loops property of Parcels.
So, it is possible to combine the two to get what I need.
Then I turned to the Report facility. The METESBOUND XSL iterates Parcel segments but provides the distance and bearing instead of the vertices. I was hoping to get to the bottom of the linked code to edit it and produce the vertices output. But - I failed again. Cannot see how the XSL files get to the data needed.
Is there maybe a book or comprehensive reference on the XSL files that provide the reporting function?
Is it possible to create a Slope Stake Report for multiple baselines?. When I generate the report, it only creates a report for the first baseline of the corridor. All of my sample lines are in the same section group, so I'm wondering why it would not create all my sampled stations.