AutoCAD Architecture :: Schedules With Percentages
Dec 2, 2011
Is there some way to create a table with percentages? Example:
EXTERIOR MATERIALS
BRICK VENEER 3,451 SF 43%
PLASTER 4,320 Sf 57%
TOTAL 100%
This was cross-posted to the AUGI forums... No responses.
View 3 Replies
ADVERTISEMENT
Nov 20, 2013
I'm attempting to create a room schedule for my floor plan that shows Room Number, Room Name, Area, and Ceiling Height. First off, I would like to tag the rooms with just the Room Number, and not both the number and name - can that be done? Second, I'm able to schedule the Room Numbers and Names correctly, but the Area and Ceiling Height columns are filled with ? marks.
This is strange because I can clearly see the space area in the properties tab when I click on each space. *In the attached screenshot, note how both the base area and space height are visible in the properties tab when I have a space selected.
View 6 Replies
View Related
Feb 12, 2013
i have created a door schedule and it seems to be missing the most important part, the sizes! When I go into Style Manager and click on the door shcedule and try to add columns size does NOT come up as a choice. I have added size to the property sets of the doors. I have tried everything I can remember from older versions of Autocad and it just won't put in this bit of information.
View 6 Replies
View Related
Jun 11, 2013
ACA 2012: Is it possible to add a column to my door and window schedules that automatically shows the area of the door/window(or area of Glazing) and then have a total area column at the bottom of the column?
View 3 Replies
View Related
Jul 23, 2011
All my layers are turned on, when in an existing drawing my schedules do not appear when I use the tool to create them. When I open a new drawing draw a wall and a couple doors, the schedule inserts when I use the annotate tool. I am only using a basic floor plan at the moment, no xrefs or anything else, simple walls and doors and inserted from the program. I did use tags for the doors and windows which worked fine.
View 4 Replies
View Related
Feb 14, 2012
I have ACAD Arch 2012 and I am trying to associate my door tags with my door schedule and visa versa. I get as far as creating the Door Schedule with all the doors on it and quantified just the way you would want to see it; however, the "Mark" remains "A" for every door. I discovered that I can change the Mark on the extended properties of each door, but I believe there should be a better (and more linked) way to accomplish this. Since the program already recognizes how many doors there are of a specific style it should be able to put sequential "marks" to each door, for example "A", "B", "C", etc.
what's the difference between Door Tags - Project Based and regular Door Tags?
View 1 Replies
View Related
Aug 16, 2013
I am using AutoCAD Civil 3D to do a slope analysis across project locations. When defining slope categories, I am finding that the max slope percentages are astronomically high; ranges are being returned up to 360,000%--and I've only done three regions! I understand vertical slope but these percentages are not realistic by any means, especially through the areas in which I am working.
A specific example: between a contour at elevation of 792 ft and a contour at elevation of 794 ft at a distance of approximately 60 feet, the slope percentage being returned is in the 9000% range. There is not a sudden drop or rapid change in elevation between these two contour intervals to provide reason for this high of a percentage. I would expect to have a slope percentage nearer the 3% range.
The data source of the contour information is LiDAR being brought into CAD via the task-based geospatial option using MapImport. All data tables are being kept. Polygons are being imported as closed polygons. There are no surface errors being reported upon creation. The project locations were created in another program and imported into CAD using the same manner. The only thing that I can conjure up is that there is some sort setting issue.
View 4 Replies
View Related
Feb 12, 2013
i have created a door schedule and it seems to be missing the most important part, the sizes! When I go into Style Manager and click on the door shcedule and try to add columns size does NOT come up as a choice. I have added size to the property sets of the doors.
View 4 Replies
View Related
Feb 18, 2013
How to add buttons and create my own ribbon in AutoCAD, but now I would like to be able to have buttons for two different schedules that I have created. While I can have a button start the schedule command it won't automatically pick the schedule that I want it to create.
View 1 Replies
View Related
Feb 3, 2012
I have been working as a comic book colorist for US publishers for the past 3 years and have self-taught Photoshop Cs3 to myself over the past years.
Usually when i work on a comic book and check my blacks with a color picker it comes to:- 75% Cyan, 68% Magenta, 67% Yellow, and 90% Black
, but recently one of my publishers asked me to Ensure the blacks are:- 60% Cyan, 40% Magenta, 40% Yellow, and 100% Black. I have tried a lot of different setting in the color setting options in Photoshop, but have not managed to get the same percentages as specified by my publisher.
How can i manage to do this without affecting the color quality of rest of the page, as i would not want the print quality to be affected.
View 2 Replies
View Related
Feb 27, 2006
is possible to use percentages?
i have disabled "constrain proportions". i fill in W & H. photoshop automatically rounds up. my web designer has my thumbnails on my site (photography site) sized at W41.6 and H98.8.
View 1 Replies
View Related
Jan 19, 2005
I know you can rescale an image by using Transform and then typing figures into the percentage boxes on the toolbar but is it possible to change these boxes to accept actual measurements rather than percentages.
I relaise you can drag the edges of the image to resize it but this is too fiddly and time consuming when you have lots of images making up a larger design.
View 4 Replies
View Related
Dec 12, 2003
it asks to select a percentage of a color. Example (30% black, 45% gray)
I don't understand how to accurately get a percentage of color.
how to get percentages of color conveniently in Photoshop?
View 4 Replies
View Related
Oct 24, 2011
Is it possible to export a room finish schedule to CAD? If so, how is it done?
View 4 Replies
View Related
Jan 9, 2014
AutoCAD 2010
AutoCAD LT 2013
Revit Architecture LT 2013
View 2 Replies
View Related
Jul 8, 2013
Fiddling around with schedules, I found a workaround to set the row height. Simply:
1 - Add a field which doesnt' contain any data to the schedule;
2 - In the schedule view, select the field's column and in the appearance tab, define a font size to whatever size of rows you would like.
3 - When you now add the schedule to a sheet, you can see that the height of each row is bigger
4 - If you selected to show gridlines, you can define the newly added column in the schedule view to have no borders
And that's my workaround. It's way better than adding spaces and adjusting widths.
View 2 Replies
View Related
Jun 1, 2012
Whenever I am about to change the dimension of an element, in the option bar, width and height appear in percentages.
Is there a way I can make these appear in pixels?
View 2 Replies
View Related
Aug 3, 2012
Using Photoshop CS5 for the PC.
When I select a layer and look at the info panel, I see that the layer height and width is shown apparently by default in percentages. Specifically 100% Height and 100% Width.
I would prefer that the Info panel show height and width in Pixels instead of Percentages. Finally, after seeing the height and width in Pixels I want to change the height by entering the height in pixels. How can I do that?
I don't want to use a "ruler" to do this, I just want to be able to enter the pixels (height and width) that I want the layer to b resized. For example when selecting a rectangle that is currently 100 pixels tall and 50 pixels wide, I want to be able to just change 50 pixels wide by entering (in a field) 25 to make it 25 pixels wide.
In Fireworks I resize by pixels all the time. But can't find a similar method in Photoshop.
View 3 Replies
View Related
Oct 25, 2011
I want to detect percentages of my artist's oil colors in any area of a vectorized photo that I point to.
So, I want to first vectorize a photo to reduce it to manageable separate color areas. Then, I want to be able to get a list of the various percentages of 108 different colors that make up any of the vector color shapes I point to or select. These 108 different colors are somewhat accurate small bitmap swatches that correspond to 108 artist's oil paint colors.
Alternatively, can I just somehow plug in this 108 swatch palette and have a software (Xara?) break down a bitmap into areas of vector color using only this custom palette?
Is this possible in Xara, or by any other means you know of?
View 8 Replies
View Related
Jul 22, 2013
I recently bought an HP 6600 printer to replace a cheapo Lexmark printer.
I'm making maps -> photoshop to Illy to print with tiling set at 6-8 pages. When I print on the new HP, the resize percentages are off; so streets, numbers, text, etc. do not line up when pieced together.
This did not happen with the cheapo Lexmark, so I am assuming that it is the printer?
View 1 Replies
View Related
Jan 14, 2013
I'm making a swatchbook (Pantone ® style), with a large 100% swatch and three smaller ones (5%,25% and 50% ink.). Right now I've got a 7x7 grid with all the swatches as I want (see screenshot), however the other 26 other pages only have the 100% swatch. Is there an 'automated' way I can make the smaller swatches in the 3 different percentages?
View 3 Replies
View Related
Jun 26, 2013
Is it possible to organize the schedules/quantities into filters and folders, like the way that views are grouped and organised?
View 1 Replies
View Related
Mar 15, 2011
I have an issue where filtering my framing member schedules per Level by, for example, Level equals LEVEL 3 causes the entire schedule to be filtered to empty. We clearly have members constrained to and occuring on LEVEL 3.
The same happens when filtering for, say, at or above LEVEL 3, but interestingly not at or below LEVEL 3, in which case nothing happens -- that is, it still displays members clearly occuring only on and constrained to Reference LEVEL 5.
View 2 Replies
View Related
Jun 19, 2012
I've made a design in Ai CS6 (with colorspace) and have used several Pantone swatches. From a few Pantone colors I have used only a percentage of the color, for example the design consists of: 75% of Pantone 485 C, 32% of Pantone 1345 C and 100% of Pantone 154 C.
In the process of the design I have used several other Pantone colors which are not used in the final design, but they are still in the Swatch tab/list. So when you click on the triangle (upper right corner) > "Select All Unused..", the Pantone colors that are only used as percentages (Pantone 485 C & Pantone 1345 C in the example) are being selected as "Unused" ?!
I have been using Ai CS4 before this version and in that version this wasn't a problem.I could you percentages of Pantone colors without the swatch being selected as "Unused".
I really don't want to manual delete every unused swatch by dragging it into the trash bin.It would be such a time wasting handling.This is really inconvenient as I am working for a print and design company and need to save the Pantone colors that are used in the design, even if they are only a percentage of the Pantone swatch.
View 4 Replies
View Related
Dec 19, 2011
Is there a way to combine several multi-category schedules, so that the calulation of the total cost can be displayed in one final schedule?
View 1 Replies
View Related
May 22, 2013
I am working on a project doing cost estimating and product specification for interiors. First project ever using Revit!
In my "Wall Finish Schedule" I need to show the finish material, the Area (SF) and cost. For tile on the wall I have created basic walls which works great. For my painted walls I used the split face tool and applied the material with the paint tool. Double checking the SF calculations for the applied paint - they are incorrect and seem to calculate the whole wall instead of the split area with material applied.
What is the best solution to properly apply wall materials so they schedule properly?
View 1 Replies
View Related
Jul 11, 2013
I am using Revit 2013 and I am wondering if there is any easy way of getting my generic model schedules to get the length of the object without having to manually type it in?!
I have attached 2 images to explain what I am talking about. I have created my own countertops and decided for scheduling purposes it would work best to have them as generic models. As you can see from the "Counter Top Properties" image that it has the length of my countertop in the program, but as the "Counter top Schedule" Images shows I can not choose "Length" as an available field. I had to create a parameter for the length ("Length of Unit"), which is just a dimension parameter, and I have to type in manually what the length is. Is there a way to get my schedule to get that length dimension automatically without having to manually type it in!?
View 5 Replies
View Related
Jul 27, 2012
I created schedules inc. cost for Light fixtures, Lighting control etc. For each of the 3 schedules I was able to add the cost (based on the cost I put into the family). The problems I'm having are:
if i show the cost in the schedule view, it will show up on the sheet set. i just want to use if for cost estimating, but not show on the plans (i don't want to manually hide/un-hide all the time when i want to see the cost) - i could duplicate that schedule and hide the cos columns on the one i put on the sheet. but that seems archaic and doubles the number of schedules i don't see a way to combine the cost. Right now I only have 3 schedules and can add those up in my head, but like to automatically do that for many schedules. i know i could export to Excel.. but that takes away the whole "Revise instantly" idea and I want to be able to see right away what cost changes when I add or delete items.
View 5 Replies
View Related
Jun 17, 2011
Is it possible to edit a Revit schedule template? We need the schedule to be vertical not horizontal.
View 4 Replies
View Related
Jul 10, 2013
I was wondering if there could be a feature where you can right-click the Navigator window to set custom percentages?
When you currently right-click the navigator it just uses the OSX system right-click. I have been needing to use the percentage 133.33 during a project and have to manually type it in each time. If you could mark custom percentages as a breakpoint it would allow me to jump to that breakpoint when using CMD - /CMD + .
View 3 Replies
View Related
Sep 24, 2013
This is linked to me previous door query. We are working in a bit of a vacuum here and I am really interested to see how people set up their door families / types / instances for scheduling - as we are struggling to identify a 'best practice' approach.
At present we have set up a host family for the doorset that contains the opening and framing, with a nested doof leaf family in which is nested a door furniture family (and possibly vision panel face hosted family as well). It seems quite complicated, and in the current setup all the door / frame / leaf parameters are established in the door Type, and we have no Instance parameters other than Mark, level etc.
We are trying to set up a system where we will have Types for:
Main Door Assembly Type (dictates the frame type, overall fire and acoustic resistances)
Door Leaf Type (Thickness dictated by the fire resitance set in the host)
Door Furniture type (Door furniture set on the door leaf type)
We intend to have 'Door Furniture' nested in the 'Door Leaf' Nested in the overall 'Door Assembly'
There is another potential set of Types for the Door Frame / Architrave - which for the moment we have only as Profiles with their own parameters.
It does seem to be getting very complication, with lots of Types and I'm not sure whether that approach is worth the time in setting it up.
I was chatting to someone who says they deal with most of the parameters as instances within a handful of Door Types (1 Type for each main elevation appearance for a door, so 1 type may have instances of FD30, FD60, FD00, Veneer Finish, Laminated Finish etc.) This seems far simpler than our approach, but I'm not sure on the trade offs in flexibility.
I was hoping to set up a door family set that we could use from project to project that has quite a bit of flexibility. How do you arrange your doors / schedules in a typical project ?
View 3 Replies
View Related