Revit :: Up / Down Justify In Schedules

Jan 9, 2014

AutoCAD 2010

AutoCAD LT 2013

Revit Architecture LT 2013

View 2 Replies


ADVERTISEMENT

Revit :: Export Schedules To CAD?

Oct 24, 2011

Is it possible to export a room finish schedule to CAD? If so, how is it done?

View 4 Replies View Related

Revit :: How To Set Row Height In Schedules

Jul 8, 2013

Fiddling around with schedules, I found a workaround to set the row height. Simply:

1 - Add a field which doesnt' contain any data to the schedule;
2 - In the schedule view, select the field's column and in the appearance tab, define a font size to whatever size of rows you would like.
3 - When you now add the schedule to a sheet, you can see that the height of each row is bigger
4 - If you selected to show gridlines, you can define the newly added column in the schedule view to have no borders
 
And that's my workaround. It's way better than adding spaces and adjusting widths.

View 2 Replies View Related

Revit :: Filter And Folders For Schedules

Jun 26, 2013

Is it possible to organize the schedules/quantities into filters and folders, like the way that views are grouped and organised? 

View 1 Replies View Related

Revit :: Filtering Schedules By Level?

Mar 15, 2011

I have an issue where filtering my framing member schedules per Level by, for example, Level equals LEVEL 3 causes the entire schedule to be filtered to empty.  We clearly have members constrained to and occuring on LEVEL 3.
 
The same happens when filtering for, say, at or above LEVEL 3, but interestingly not at or below LEVEL 3, in which case nothing happens -- that is, it still displays members clearly occuring only on and constrained to Reference LEVEL 5.

View 2 Replies View Related

Revit :: How To Combine Several Multi Category Schedules

Dec 19, 2011

Is there a way to combine several multi-category schedules, so that the calulation of the total cost can be displayed in one final schedule?

View 1 Replies View Related

Revit :: Paint Tool Giving Inaccurate SF On Schedules

May 22, 2013

I am working on a project doing cost estimating and product specification for interiors.  First project ever using Revit! 
 
In my "Wall Finish Schedule" I need to show the finish material, the Area (SF) and cost.  For tile on the wall I have created basic walls which works great. For my painted walls I used the split face tool and applied the material with the paint tool.  Double checking the SF calculations for the applied paint - they are incorrect and seem to calculate the whole wall instead of the split area with material applied.
 
What is the best solution to properly apply wall materials so they schedule properly?

View 1 Replies View Related

Revit :: Generic Models Schedules To Get Length Of Object

Jul 11, 2013

I am using Revit 2013 and I am wondering if there is any easy way of getting my generic model schedules to get the length of the object without having to manually type it in?!
 
I have attached 2 images to explain what I am talking about. I have created my own countertops and decided for scheduling purposes it would work best to have them as generic models.  As you can see from the "Counter Top Properties" image that it has the length of my countertop in the program, but as the "Counter top Schedule" Images shows I can not choose "Length" as an available field. I had to create a parameter for the length ("Length of Unit"), which is just a dimension parameter, and I have to type in manually what the length is.  Is there a way to get my schedule to get that length dimension automatically without having to manually type it in!?

View 5 Replies View Related

Revit :: Cost Estimating In Schedules - How To Combine Categories

Jul 27, 2012

I created schedules inc. cost for Light fixtures, Lighting control etc. For each of the 3 schedules I was able to add the cost (based on the cost I put into the family). The problems I'm having are:

if i show the cost in the schedule view, it will show up on the sheet set. i just want to use if for cost estimating, but not show on the plans (i don't want to manually hide/un-hide all the time when i want to see the cost) - i could duplicate that schedule and hide the cos columns on the one i put on the sheet. but that seems archaic and doubles the number of schedules i don't see a way to combine the cost. Right now I only have 3 schedules and can add those up in my head, but like to automatically do that for many schedules. i know i could export to Excel.. but that takes away the whole "Revise instantly" idea and I want to be able to see right away what cost changes when I add or delete items. 

View 5 Replies View Related

Revit :: Vertical Schedules - Possible To Edit Schedule Template?

Jun 17, 2011

Is it possible to edit a Revit schedule template? We need the schedule to be vertical not horizontal.

View 4 Replies View Related

Revit :: Setting Up Door Families / Schedules In Typical Project

Sep 24, 2013

This is linked to me previous door query. We are working in a bit of a vacuum here and I am really interested to see how people set up their door families / types / instances for scheduling - as we are struggling to identify a 'best practice' approach.
 
At present we have set up a host family for the doorset that contains the opening and framing, with a nested doof leaf family in which is nested a door furniture family (and possibly vision panel face hosted family as well). It seems quite complicated, and in the current setup all the door / frame / leaf parameters are established in the door Type, and we have no Instance parameters other than Mark, level etc.
 
We are trying to set up a system where we will have Types for:
 
Main Door Assembly Type (dictates the frame type, overall fire and acoustic resistances)
Door Leaf Type (Thickness dictated by the fire resitance set in the host)
Door Furniture type (Door furniture set on the door leaf type)
 
We intend to have 'Door Furniture' nested in the 'Door Leaf' Nested in the overall 'Door Assembly'
 
There is another potential set of Types for the Door Frame / Architrave - which for the moment we have only as Profiles with their own parameters.
 
It does seem to be getting very complication, with lots of Types and I'm not sure whether that approach is worth the time in setting it up.
 
I was chatting to someone who says they deal with most of the parameters as instances within a handful of Door Types (1 Type for each main elevation appearance for a door, so 1 type may have instances of FD30, FD60, FD00, Veneer Finish, Laminated Finish etc.) This seems far simpler than our approach, but I'm not sure on the trade offs in flexibility.
 
I was hoping to set up a door family set that we could use from project to project that has quite a bit of flexibility. How do you arrange your doors / schedules in a typical project ?

View 3 Replies View Related

AutoCAD Architecture :: Schedules With Percentages

Dec 2, 2011

Is there some way to create a table with percentages? Example:

EXTERIOR MATERIALS
BRICK VENEER 3,451 SF 43%
PLASTER 4,320 Sf 57%
TOTAL 100%

This was cross-posted to the AUGI forums... No responses.

View 3 Replies View Related

AutoCAD Architecture :: Room Tags And Schedules

Nov 20, 2013

I'm attempting to create a room schedule for my floor plan that shows Room Number, Room Name, Area, and Ceiling Height. First off, I would like to tag the rooms with just the Room Number, and not both the number and name - can that be done? Second, I'm able to schedule the Room Numbers and Names correctly, but the Area and Ceiling Height columns are filled with ? marks.

This is strange because I can clearly see the space area in the properties tab when I click on each space. *In the attached screenshot, note how both the base area and space height are visible in the properties tab when I have a space selected.

View 6 Replies View Related

AutoCAD Architecture :: Sizes In Door Schedules?

Feb 12, 2013

i have created a door schedule and it seems to be missing the most important part, the sizes!  When I go into Style Manager and click on the door shcedule and try to add columns size does NOT come up as a choice.  I have added size to the property sets of the doors.  I have tried everything I can remember from  older versions of Autocad and it just won't put in this bit of information.

View 6 Replies View Related

AutoCAD 2013 :: Sizing In Door Schedules?

Feb 12, 2013

i have created a door schedule and it seems to be missing the most important part, the sizes!  When I go into Style Manager and click on the door shcedule and try to add columns size does NOT come up as a choice.  I have added size to the property sets of the doors. 

View 4 Replies View Related

Photoshop :: Justify Text In PS CS2...

Jan 13, 2009

1. ctrl shift J does not work.

2. I can bring up the paragraph window. The Justify button won't engage. If I select an area of the text with a box tool it engages to click it but nothing happens.

3. I tried cut and paste in word.

View 7 Replies View Related

AutoCAD Architecture :: Add Column To Door And Window Schedules

Jun 11, 2013

ACA 2012: Is it possible to add a column to my door and window schedules that automatically shows the area of the door/window(or area of Glazing) and then have a total area column at the bottom of the column?

View 3 Replies View Related

AutoCAD Architecture :: Window And Door Schedules Not Appearing?

Jul 23, 2011

All my layers are turned on, when in an existing drawing my schedules do not appear when I use the tool to create them.  When I open a new drawing draw a wall and a couple doors, the schedule inserts when I use the annotate tool. I am only using a basic floor plan at the moment, no xrefs or anything else, simple walls and doors and inserted from the program.  I did use tags for the doors and windows which worked fine. 

View 4 Replies View Related

Photoshop :: Right Justify Text Tool?

May 15, 2006

I'm trying to create a Signature for my photos. The problem is, it's difficult to come up with a signature in the lower right corner that works with both portrait and landscape orientation. What I'd like to do is, "right justify" the text in the lower right corner.

Anyone know of a way to do that?

View 6 Replies View Related

Photoshop :: Unable To Justify Text

May 30, 2008

I am using PS CS on windows XP pro. The problem I've encountered is not being able to justify text. This particular text was created by just clicking the text tool and typing. I have another type layer that was created by drawing a text box and I can justify this type all day. Am I correct in that only type layers created by first drawing a text box can be justified.

View 6 Replies View Related

Photoshop :: Unable To Justify Text

Jan 28, 2007

I'm trying to justify the text but i'm not able to click on the option to do so. The text i've written so far i've had to press return to get to the next line cause i guess the margins are set too wide?

how do i specify the margins and secondly, once i've done this will i be able to justify the text?

View 5 Replies View Related

AutoDesk Smoke :: How To Set Justify For 3D Text Object

Jul 17, 2013

So in Action, how do I set the justify for a 3D Text object? 
 
I've moved on... But for the life of me I can not find the option to set the justify for 3D Text. I thought I had done this before in action, but I can't find the option.

View 1 Replies View Related

AutoCAD Architecture :: Justify Entire Schedule?

Dec 6, 2012

Is it possible to Justify an entire schedule?  It appears that my schedules have an anchor point that is the upper right corner.  Is it possible to change it to the upper left corner?

View 3 Replies View Related

AutoCAD 2013 :: How To Justify Text In A Dimension

Aug 20, 2013

I just made an object, specifically, a rectangle with 6 units of height and 30 of long. Now I want to write text in the middle of the rectangle, I was able o find the middle point using osnap and a diagonal line (the point would be 3 units of height and 15 of long) but when I start writing text (with dtext) the text starts writing from that middle point to the right,  If its a long text its not in the middle it starts in the middle :/ what can I do so the text will be exactly at the center?

View 5 Replies View Related

AutoCad :: Justify Text Into Center Of Circle

Oct 11, 2007

I Have A Circle, Is There A Command To Insert Text Into Centre Of That Circle.

I Can Do Enclose Text But Not The Above.

View 5 Replies View Related

Illustrator :: Paragraph -> Justify All Lines Does Not Work?

Jan 14, 2014

Paragraph > Justify all lines does not work - why?

View 1 Replies View Related

Illustrator :: Area Type Box - Justify All Lines

Oct 23, 2012

I want to create an Area Type box and have all of the text line up on both the left and right sides, so I use the Justify all Lines option.
 
1. After doing this, is there a way to adjust the spacing of the headline? I tried adjusting the tracking, though that didn't work. Is the only way to use a separate Area Type or Point Type for the headline so it is not affected by the Justify all Lines option?
 
2. Is there another way to acheive what I want?

View 2 Replies View Related

Illustrator :: CC - Paragraph Justify Doesn't Work

Jan 13, 2014

Windows 7 Enterprise 64 bit
Illustrator CC 64 bit
 
Within Illustrator select text tool.Type in a few lines of text with carriage return.Select all the text in the paragraph..Go to paragraph panel..Select the justify icon...NO results...the paragrpah is not justified

View 5 Replies View Related

Illustrator :: How To Justify Text Of Bulleted List

Dec 2, 2013

it is possible to justify the text of a bulleted list in the same way as for a paragraph? I can do it in Microsoft Word but I can't seem to do it in Illustrator.
 
When I justify the text of a paragraph in Illustrator it works perfectly fine. But when I do it for bulleted text, it gets all weird.

View 7 Replies View Related

AutoCAD Visual LISP / AutoLISP :: Ribbon Button - Custom Schedules

Feb 18, 2013

How to add buttons and create my own ribbon in AutoCAD, but now I would like to be able to have buttons for two different schedules that I have created. While I can have a button start the schedule command it won't automatically pick the schedule that I want it to create.

View 1 Replies View Related

Photoshop :: CS6 - Justify Last Left In Paragraph Dialog Box Grayed Out?

Apr 4, 2013

Had do you activate the "Justify last left" in the Paragraph dialog box in PS CS6? It grayed out.

View 2 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved