VideoStudio :: Inserting Video In The Middle Of Project?

Mar 25, 2013

I could not find anything on this. Is it possible to insert a video clip into the middle of a project? I have tried inserting a video and it always adds it to the end of the project not where I want it to go.

View 2 Replies


ADVERTISEMENT

VideoStudio :: Video Quality When Inserting Instant Project?

Nov 12, 2011

I downloaded the trial version of pro 4x and love the video clarity and smoothness....even running at 60FPS. However, when I try to start editing with the "Instant Project", I start to have issue.

1. The intro is fine.....very smooth

2. However, when it gets to the video portion, the quality and "shuddering" of the vidoe is horrible.

View 2 Replies View Related

VideoStudio :: Add Video In The Middle Of Timeline Without Changing Sync?

Jul 16, 2011

how do i add a video in the middle of timeline without changing the sync between other videos/audios in the rest of timeline ?

for example when i add a video(30sec.) at min.(1) , all the videos after min.(1) is shifted for 30 sec. , but all audios+images+titles (AFTER 1st min.) is still in it's same time , so the syncing is gone.

View 1 Replies View Related

VideoStudio :: Inserting Continuous Text Through Video

Feb 24, 2013

How can I enter continuous text that runs the entire length of a 8 min project. I know how to enter a title, but I need unbroken text narration.

View 2 Replies View Related

VideoStudio :: Inserting Photo In Video Track

Jun 9, 2011

I am putting together a biographical video of my wife and myself for our kids (married 50 years). I want to have a video of her (example) sitting and talking about growing up. Is there a way to insert a photo on the main video track and still keep the voice track intact? Example: She is talking about her childhood. A photo apears of her as a small girl while she is still talking. The photo goes away after a few seconds and there she is live and taliking. I hope to get away from using the overlay track.

View 6 Replies View Related

VideoStudio :: X2 - Inserting Title Overlays Latter Video Clip?

Jul 20, 2012

I've been unable to resolve a problem encountered when I insert a "title" to overlay on the first 30 seconds of a corresponding video clip.

When played back, the subsequent portion of the remaining video clip past 30 seconds goes missing. However, on this "missing portion" the audio portion of the video clip is present while the video portion becomes solid black to the end of the clip. The same result happens when I burn it.

In the "PROJECT" playback mode both the title and the video play fine, as do both the video and title in the "CLIP" mode.

View 4 Replies View Related

VideoStudio :: Retaining Audio While Inserting Video Clips

Sep 22, 2011

I am using VideoStudio v11. I have a long section of video which is of someone making a speech. I want to insert some cut-aways into the sequence, whilst obviously retaining the audio running sequence.

I have split the audio from the video track, but I can't seem to figure out how to remove a section of the video and replace it exactly with a cut-away section of video. I need to keep the video and audio in sync. Maybe I am going about it wrong and don't need to split the audio off - but then how would I insert just a clip of video without disturbing the audio.

View 1 Replies View Related

VideoStudio :: Combining Different Video Formats In A Project?

Jul 13, 2013

I have several different video clips with different formats from different cameras I'd like to use in one project. Is this possible and if so, is the rule to use the lowest common denominator? e.g. One file type is 25fps, 720x576 non-hd and another is 50fps, 1280x720 hd, so the output would have to use the first specs? What about different clips and the upper, lower, frame based thingy? I did try one experiment combining the two examples above using the first specs to create and avi file and the original 720x576 quality was reduced but the 1280x720 came out fine. Thats why Im asking - If I created the output based on the first lower specs, why did the clip with those specs turn out worse?

View 14 Replies View Related

VideoStudio :: Crop 16:9 Video Clips For Use In 4:3 Project?

Jul 24, 2011

I'm trying to integrate 16:9 HD video clips into a 4:3 project (or vica versa). Obviously it will take cropping the edges but how? VS does not appear to be up to the task that I can figure. Maybe a third party utility?

View 1 Replies View Related

VideoStudio :: X3 - Video Clips Get Lost In Project

Oct 15, 2010

I am using VS X3 and recently have a problem with it. At the time moive created there are couple clips in dark but they were ok when I edited them in the project status.

View 6 Replies View Related

VideoStudio :: X4 / Fitting Video Project On 4.7G Disc?

Mar 31, 2011

If my video project is to big to fit on a 4.7G disc and X4 prompt to fit it in the burn to ISO or Video TS stage, the end result have 1 or more video clips converted to heavily low quality, approximately a bit more than 3000 bit rate, but not all the video clips are converted. The end result is that some video clips have grainy scenes with some artifacts on the TV.

Since it is very time consuming to batch convert all the videos of the project to a lower bit rate in order to fit it on a 4.7G disc (choosing one bit rate specification, see if all videos plus menus fit, choose another lower bit rate and start batch converting again if not...), I decided to use the 8.5G option of X4 with the original quality formerly rendered videos and finish the dvd building in that way. After that I choose DVD Shrink 3.2 to compress it on 4.7G. DVD Shrink successfully compress a 5.2G project DVD to 4.7G (actually 4.4G) with a 95% compression rate with a sharp function. The overall end result's playback quality was far more better than when using batch convert to a lower bit rate with X4. Just want to mention that X2 handled such a compress to fit request better.

The last time I've needed to go the DVD Shrink way for compressing large DVD sizes were in the days of VS 11. By mentioning VS11, that was also the time when I got several crashes with DVD authorizing. I remember I had to set VS 11 to convert all DVD compliant MPEG again to have a smooth playback without Video/Audio multiplexing problems.I always use formerly rendered MPEG2 files. I never use the edited project to author a DVD.

View 12 Replies View Related

VideoStudio :: Copy Video Clips From One Project To Another?

Nov 20, 2012

I'm working on a project that pulls together many short clips from many much longer video files e.g. there might be less than a minute pulled from a 60 minute file then another then another etc. I found that my computer (which is reasonably beefy) was struggling to cope with the workload so I split the project into separate project files i.e. Part 1, Part 2 and Part 3. My thinking was that once I had done all the editing I could cut and paste all the clips into a single new project file before rendering the entire thing. But I can't work out how to do it! Sure, I can copy and past individual clips or even a sequence of clips but on pasting they lose all the editing I've done! I just end up with a uniform bunch of unedited clips!

I guess the alternative is to render each project file (1, 2 and 3) separately then pull the rendered videos together into Project 4. I can then render Project 4 to give me my final 'movie'. But surely that means as I've rendered everything twice I'm suffering a quality loss?

So the question is: is there any way of copying edited video clips from one project file into another project file AND retaining all the edits?

View 2 Replies View Related

VideoStudio :: Copy Video Lines From Old To New Project

Jan 3, 2013

I was wondering if there is a way to copy tracks (video, overlay, audio) from an old project into a new project.
I have tried copy them and paste them but that is not possible.

An other solution could be to make a video file of the "old project" and import that on the video track in the new project.

In the past using Pinnacle copy tracks from other projects and paste them in new projects was a possibility.

View 4 Replies View Related

VideoStudio :: Saving Project As Video Format (WMV)

Jul 30, 2011

I have made a project last night. and when I was gonna save it, it was written that video studio only save file as *VSP. I want to know how to save the project as a video format for example as *WMV or something like that.

View 2 Replies View Related

VideoStudio :: No Video When Playing Project - Version 10

Feb 6, 2011

when I try to preview my project, I do not get any video. I can hear the audio though. When I preview individual clips I have both audio and video.

View 7 Replies View Related

VideoStudio :: X4 Project Properties Cannot Match Source Video

Mar 20, 2011

In VS X4 we do not have the ability to match the project properties to the specs of the source video. When editing "project properties", we only have two choices for compression (NTSC DVD and PAL DVD) which only allow a maximum resolution of 720. In X2 we had many more choices which included MPEG-2 where we could get up to 1920.

I thought it was rule number one to match the project properties to the source video. Maybe that is not so important anymore, but snapshots for freeze frames must be done in project mode to include any attributes. The resulting snapshot is the resolution of the project properties and therefore not the same as the orignal video. Once rendered, it will not look the same as it's parent frame. Maybe freeze frames are not important to anyone else, but they are to me.

I shoot with a Canon HV20, so I need 1440x1080. I have created an empty project in X2 with the correct properties that I use to start projects in X3 and X4. X4 appears to maintain the project properties once they are set.

View 12 Replies View Related

VideoStudio :: Pro X5 - DVD Burn From Project / Audio Ahead Of Video

Nov 20, 2012

I am burning DVDs from an hour long project file in ProX5, of a two act opera. Act I burned fine, but Act II which is a separate project comes out on the DVD with the audio ahead of the video. I am making coasters, have quite a collection. I've never had this problem before with burning DVDs. I have burn speed set to 16x, not maximum. In the past I normally use the project rendered to a movie for the DVD burn, but with editing changes I keep making, it is faster to just burn directly from the project.

I am not using a separate audio file. The audio is embedded in the video.When I play the project and not the DVD, the audio and video are fine.

View 4 Replies View Related

VideoStudio :: Matching Project Settings To AVCHD Video Clip - X3?

May 28, 2011

I'm trying to match the project settings to an imported HD video clip (1920x1080 *.mts).I've been using videoStudio for years but only in 720x480 SD. I just got a Panasonic HDC-SDT750PP HD camera and want to make sure the video output file makes the most out of both camera and X3 but in project settings it only allows 720x480.

Does the project setting have any affect on the final video file?The properties of the video file says 1920x1080 24b H264 yet the source file extension is *.mts

My intention is to create a HD video file that I burn to a Hybrid DVD until I get a Blu-ray burner but what format to save the file in if the X3 project setting only goes to 720x480.

View 2 Replies View Related

Photoshop Elements :: Cannot Move Text Boxes While In Middle Of A Project

May 24, 2013

For some reason, I suddenly cannot move my text boxes while in the middle of a project.  I get either the hand or arrow but I am not able to move it.

View 5 Replies View Related

AutoCad :: Inserting Title Block - Design In Middle Of Block?

Jul 30, 2013

How do you insert title block, so your design is in the middle of block?

View 9 Replies View Related

VideoStudio :: Create Smart Package From Project File That Has Smaller Component Project Files?

Aug 22, 2011

I've built a project up with several smaller project file components. It's an easier way to create a video than editing one big project.

Opening the overall project and running it on screen is not a problem. However, when I try to create a smart package of the composite project, I get a consistent error message rejecting the process because of the existence of the component vsp's.

Is there a way to avoid the error and create a smart package from a project file that has smaller component project files?

View 7 Replies View Related

AutoCad :: Change To Avoid Dimensions That Explode After Inserting Into A Project

Mar 5, 2013

Which setting(s) do I need to change to avoid dimensions that "explode" after inserting into a project. Example, several Architects I deal with, when any dimension string is placed into the drawing, there is a prompt to either type in or hit enter for the dimension shown. I will save the drawing, but if I get into the drawing later and need to continue the dimension string, I cannot select the previous dimension as it is now just lines and text. I am using Autocad 2013 and have never been able to figure this out.

View 1 Replies View Related

After Effects :: Inserting Video Into Templates?

Feb 28, 2014

I have a template I am working with that I want to insert video clips into. The template has jpegs that say "insert photo or video here". How do I swap the jpeg with the video clip without losing the keyframes and effects? I'm not well-versed enough to just re-do them all. I am using the templates to learn the program but to also build a few videos for the non-profit I work for.
 
Another thought I had was if it was possible to copy all the attributes/effects/keyframes from one media piece to another. So if I were to add the video clip to the composition and copy the attributes from the template photo to the video clip I just added and then make the template photo invisible.

View 1 Replies View Related

VideoStudio :: How To Remove Small Section From The Middle Of Clip

Mar 15, 2011

How do I remove a small section from the middle of a clip? The help section tells how to shorten a clip or split it in two but not what i want to do.

View 3 Replies View Related

VideoStudio :: Ripple Edit / Placing Clip In Middle

Apr 5, 2011

Still working on my project, and should of done it the other way first.

I need to place a clip in the middle of a project that is done. Can I click ripple editing then place the clip in the middle and have all of the title track move with the clips that will be sliding to the end? Thought I would ask before moving things around.

Or can I put the clip in where it has to be, then hit ripple editing and slide all the title track where they should be all at once? I have not done to much with ripple editing, guess it is a good way to start.

View 1 Replies View Related

VideoStudio :: Split Single Video File Into Multiple Video Files?

Feb 13, 2011

I recently purchased Video Studio Pro X3 - and after going through the knowledge base and product read me, I have been unable to find an answer to the following problem I have:

PROBLEM:

I have a number of videos (HD 1080p) that I have recorded. Each video is on average 50 minutes in length - what I want to do it to be able to do is to slice this video into 10 x 5 minute videos (based on topics discussed in the video), (so essentially clip the video into these segments and edit each one) and then when producing the video file - actually create 10 separate video files (all with editing in place) instead of one single large file.

As far as I have been able to work out, I need to go through the whole file, clip relevant sections, edit them, and then save project. I then need to go trim the saved file 10 times, to extract each time the single 5 minute video I want to create. This is a fairly manual and time consuming process, hence my hope that I can create 10 files based on the clips I have made in the larger 50 minute file in one go.

as I have 30 videos to edit, so looking for ways to save time!

View 11 Replies View Related

VideoStudio :: Video Filter For Specific Times In Single Video?

Feb 24, 2011

I have a LIVE show recorded and I want to add Video Filters in various places within a single 4 minute video. Do I need to cut up my video to segments to add filters too or can I apply them to different spots in a single video?

View 5 Replies View Related

Photoshop :: Why Does Imported 1920 X 1080 Video Not Fill Frame In 1920 X 1080 Video Project

Nov 20, 2012

I have started a new video project with a resolution of 1920 x 1080 in Photoshop CS6with a pixel aspect ratio set to square..  In the project I add a video to the timeline.  The source video was created in QuickTime and exported at a 1920 x 1080 resolution MOV file.  I have check both the source clip at the canvas siye and have confirmed that both are 1920 x 1080.  However, when I import the video it takes up less than the entire frame.  It appears that the video is being scaled down so that there is some white space to the right and below the video clip.  See the image below. 
 
In the past I have been able to import 1920x1080 video to a 1920x1080 project without a problem.   I have 4 or 5 examples that have worked well. 

View 5 Replies View Related

Lightroom :: What PPI Should Be Used When Exporting For Video Project

Nov 3, 2013

I shoot RAW photos.  I like and use Premier Elements 11 to make video.  Frequently I insert photos in the videos and enjoy using the Pan and Zoom technique (frequently credited to Ken Burns).
 
Resizing photos support Premier Elements to run smoothly.  The LR Export command makes it easy.  Using PSD files works well in Premier Elements.  However, I am confused about settings.
 
My understanding is that if no Pan&Zoom or cropping is to be done in the video the export should be 1920x1080.  If Pan&Zoom is planned, the setting should be higher by about 50%.  LR makes it simple by letting you specify the "Long Edge" so the setting would be 2880.   The short edge will match the original. 
 
What about "Pixels Per Inch" for a HD 1920x1080 video project that may be played on a big HD TV or smaller YouTube?  There is plenty of information about PPI for printing and computer monitors, but not HD Video. 
 
Here is screen capture for reference:

What should the pixels per inch be set at to match 1920x1080 video?  The 140 setting is a complete guess!

View 13 Replies View Related

VideoStudio :: Error While Inserting An Image

Aug 25, 2013

I installed VideoStudio Pro X6 and service pack 1.Always then trying to insert an image I get an error message, wrong format, copy-protected or to less space, even if I try to insert one of the samples or VideoStudio created snapshot.The same error message appears then I make a snapshot but the file was created.

All the samples are linked to c:program filescorel ... instead of c:program files (x86)corel ... this is the default folder on 64-bit-systems.
Relinking is not possible.I registered the product but Corel did not send the support code!

View 1 Replies View Related

Photoshop :: Way To Open Video Project In After Effects

Jul 19, 2013

Is there a way to open a Photoshop "video" project in After Effects?  I have someone painting on video but I need to tweak it in AE.  I can import it but it sees just the first frame and makes it a still image for the length of the comp.
 
Also, I am only seeing "Photoshop Sequence" and "h.264 Quicktime" as options for video export from PS. I have all the flavors of Quicktime when rendering from AE (ProRes HQ), etc.  Couldn't PS do the same?

View 1 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved