May 15, 2012I have an existing contour surface. I would line to calculate the volume of topsoil which will be 300 mm following below the existing contours.
View 3 RepliesI have an existing contour surface. I would line to calculate the volume of topsoil which will be 300 mm following below the existing contours.
View 3 RepliesWe have a client who is looking to dispose of a large quantity of excess soil on a vacant property. We plan to hold the elevations near the northern property line, slope 2% in a southerly direction, then tie in at 3:1 slopes along the southern property line. What is the best method to determine where the break point between the 2% and the 3:1 tie grades would be?
Civil3D 2013
How can I create a top soil stripping line in an assembly?
View 6 Replies View RelatedI have a known outer boundary for my depo for excess soil. I know how much (volume wise) is going in to the depo. I know that the slope is 1:2.
I do not know where the upper boundary (top of the depo) of the depo is. That's what I would like to find out.
I know that I can create a upper boundary with a feature line and then use the grading and volume tool in order to find out at what height the upper boundary is placed. But then the outer boundary is either too small or exceeds the known boundary.
What is the easiest way of finding out where the upper boundary is? I am thinking about drawing a feature line around the known boundary on top of the EG surface and then using stepped offset. Then I can check out the volume.
But is it possible to do this automatically instead of manually?
I have trying to run lift station simulations and my calculation nodes are always flooding. They don't flood in real life so what could be a problem?
View 6 Replies View RelatedI have run a volume between two surfaces, I need to further to break that new volume surface up to get volumes for each section. I know in microstation you can fence a volume surface and it will tell you the volume for that area. Is there a function in civil 3d that works like this. I know I can break it up manually and create new surfaces, I am looking for a time saving appoarch and trying to minimize file size.
View 2 Replies View RelatedI want to use 3D civil software to calculate the the reservoir volume from the attached micro seismic data.
View 7 Replies View Relatedvolume dashboard on which method of calculating is based. Why sometime are different, huge differences between counting volume based in "computer materials" which of 3 is the best? for calculating? I am using very often average end area, is that correct?
View 2 Replies View RelatedI'm new in civil 3d road design so my question may be basic.when i prepare a corridor and proceed to get cut and fill it appears as zero.i think i made some mistake at a stage when in section line we decide surfaces..step wise from section line selection to cut/fill calculation also give me the general concept regarding selecting surfaces during cut/fill volume calculation?
View 5 Replies View RelatedI have a manure storage pond that I am trying to figure out the total storage volume for. It has 2.5:1 Side slopes and a 10 foot wide ramp at 10:1 entering the pond to the floor bottom. I am trying to figure out what the volume of this pond is. What is the fastest and most efficient way to get this volume? I do not want it compared to any other surface such as existing ground.
View 7 Replies View RelatedI attach picture 1 and 2.
I need to create surface like this picture 2. I need crate surface by joining 1, 2, 3 like as picture 2 section, but when i crating surface its joining as picture.
This problem have been found . I created a tofo of the rock which rock is bend lower picture 2 section to calculate the volume i need the surface create like this.
how to calc dirt quantities in Civil 3D. Not just on roads, but say you have a small mountain of dirt that needs to be hauled away, and the contractor asks if you can quickly tell him how much dirt is there. And subgrade quantities for pads. Things like that.
First off, I'd need to learn the correct terminology. Knowing what to call stuff can at least make you sound less stupid when you ask a question.
HP DV7 Laptop
Intel Core i7-3820QM 3rd Generation Quad Core 2.7 GHZ CPU
16 GB DDR3 RAM ( 2 DIMM ) / 180 GB SSD
Nvidia GeForce 650M Graphics w/2 GB Memory
Windows 7 Professional 64 bit / AutoCAD Civil 3D 2014
how can i do hydraulic calculation for pressured pipes using autocad civil 3d or by using any other autodesk application or extension
View 2 Replies View RelatedIn hydrographs, SCS method, the basin slope is needed for the the calculation of the time of concentration. What is the method for the calculation for the basin slope ? If we have a 3D surface is there a tool in autocad to calculate that automatically?
View 3 Replies View RelatedI have a volume in my CAD file described by 3D Faces. Is there anyway to know what is the volume of this volume -that represents an open pit-?
Every time that I do a volume I do by the comparison of 2 surfaces but this is not the case now.
I've recently started working with Civil2012/2013 (bit the bullet you might say).
I attended a course on civil about a year ago but it didn't cover all the bases.
My question: stripping calculation, is there a way fro civil to perform it automatically?
One way to calculate stripping (manually) is after i have all the tin volume surfaces, is to show the fill areas in the volume tables and then do the calculation myself.
I am highlighting an area and at the last point where I press eneter expecting an area calculation, I get this message "specify next point or [A/L/U]; I don't want that I want the area
View 1 Replies View RelatedI'm to compare volumes in c3d to Inroads. My volumes are not matching ( cut and fill are not even close). Civil 3D uses the average end area and InRoads uses 'triangle method' to calculate the total volume. How can I get C3D volumes to match InRoads which is verified correct?
View 5 Replies View RelatedI was just wondering why when I try and calculate an area using a polyine, I am getting a readout of 1.80401967E+07, when I have it set to give me the calculation in square feet? It is an area of approx. 246 Acres.....is this because the area is so large? I am not sure what the "E" stands for or the "+07" at the end....
View 6 Replies View RelatedWhat do the data in the summary of volume calculation mean? In LDD, typically the minimum and maximum elevations are within the range of elevations where the volume is being analyzed. In my current vol calc summary it shows something that really makes me frown, e.g, min elev of -26.00 and max elev of 752. I have checked all the proposed elevations and the minimum is 720.
View 9 Replies View RelatedI was wondering how to plot various soil profiles on a 3D Model of a deep excavation site. I've plotted the exterior of the area, borehole to borehole, using AutoCAD Civil 3D 2012. The problem I'm facing is that when I start plotting the layers of the different soils, say from borehole 1 to borehole 2, it ends up protruding from the face of the distance from borehole 1 to borehole 2. I'm not sure of how to make sure the plot is on a fixed axis, like y-z axes, to ensure I have a reference point. How can I go about this?
View 2 Replies View RelatedWhy cant you extrude a hatch? I am trying to draw soil in 3d and the materials in the 3d library aren't really working for me. I wanted to extrude gravel hatch from 2d material bank.
View 6 Replies View RelatedI have downloaded the SSURGO file from Web Soil Survey. They are in .shp files, I have imported the spatial files into AutoCad Map 3d 2012. My goal is to create a Topology so that I can detemine the soil type and acres of parcels of land.
When I click on the polygon in my drawing it is a closed polygon with double line or overlapping lines and it does has object data but it is part of the line not a point as I am used to.
how to create this texture and would like some tips or someone to start me off. I want to do this without any additional plugins - only the ones in photoshop. The texture I want to create is like soil - like in a plant pot.
View 3 Replies View RelatedWhen I used earlier versions of Acad I used to be able to do a calculation within a command. Like if I wanted to offset something equally on each side of a mid-point I could start the offset command then for distance I could put in the distance I wanted/2 (ie if the total distance between the 2 lines needed to be 85.375 i I could do 87.357/2). Is there some setting that I am missing or is this something that has disappeared from Acad?
View 3 Replies View RelatedI have a point from an xref and I need to find the corresponding point in the current CAD file.
The xref is offset from 0,0,0 and rotated in and from the XY plane.
I have the original point and the xreferences attachment point and normal and rotation but my calculations always come up with an error.
I have a requirement to create a block with a few attributes, but the attributes require a bit of composition behind the scenes. Here's an abstract example.
I need a block that represents a computer's identity. Each computer has 2 references that need to result in attributes that I can extract. One attribute is a unique reference across the project, and the other attribute is a room reference, and many computers can be in the same room.
Here are some example references.
Computer A
Unique Reference: DF.SALES.01
Room Reference: DG.SALES.07
Computer B
Unique Reference: DF.SALES.02
Room Reference: DG.SALES.07
Computer C
Unique Reference: DF.SALES.03
Room Reference: DG.SALES.07
Computer D
Unique Reference: DF.ADMINISTRATION.01
Room Reference: DG.ADMINISTRATION.02
Computer E
Unique Reference: DF.ADMINISTRATION.02
Room Reference: DG.ADMINISTRATION.02
As you can see from the above, the 'common' part for a computer is the middle 'SALES' or 'ADMINISTRATION' part, which 'technically' only needs to be put in/typed in by the user once for each computer. I need to automate this process to reduce user input error, such that they only enter 'SALES' or 'ADMINISTRATION' once and don't end up creating the below, which would be invalid.
Computer F
Unique Reference: DF.RECEPTION.09
Room Reference: DG.SALES.07
Thus I imagine I need a third property/field/attribute to specify 'room', and then formulate the Unique Reference and Room References, using this 'room' part in the middle.
The end goal here is that I need to be able to extract the above two references for each 'computer/block' and get them into Excel, and I need to be able to modify the 3 properties (room, unique reference and room reference) quickly, ideally using something like EATTEDIT, which is how we have edited attributes in the past.
The use case above is abstracted, it's actually not for computers at all but I figured it would make more sense than complicating it with the actual application!
I don't use the area calculation tool that much. I was just working out a large area for concrete. I use TOOLS - INQUIRY - AREA. Thats all fine and it gives me the area, for instance, to keep it simple 4900 x 9000 = 44.10m² AutoCad displays it as 44100000. I know it's not a major problem, but is there anyway I can get it to display as 44.10 or at least lose all the zeros.
View 9 Replies View RelatedIn the attached report, safety factor is se to calculate from ultimate tensile stress (485 MPa), and it indicates 1.33 with stresses:
Von-Mises: 323 MPa..............SF = 1.5
1st principal: 303 MPa.............SF = 1.6
2nd principal: -181.2 MPa....... SF =2.67
So, how is inventor getting 1.33 ?
EDIT: if I set it to calculate from yield ( 260 MPa) it accurately reports SF = 260/323=0.8
EDIT: added part file
how the area calculation works for finding the square footage of a dwg.
I can easily get a rough estimate of square footage on L X W....but when i use the area measuring tool, i get total inches and a total sq foot estimate of 1.7xxxxx which i don't understand.
Calculation of resistance, making a simulation for an aquarium stand. Stand must support about 900 kg., Is made of 18 mm chipboard, combined with screwing.
All vertical walls are triple, its made of 3 pieces of chipboard, and the above is twofold. Policies are also set to increase rigidity all the screwing structure. The dimensions are 2000 (L) x 700 (w) x 774 (h).
what weight support the stand?