AutoCAD Architecture :: Area Schedule Grouping

Oct 20, 2013

Is subtotaling still impossible with ACA 2014?

Is there a workaround to what I am trying to do?  I just want to create a table that has a list of all the spaces sorted by name, give a quantity of the spaces and the combined area of all those spaces in one row of the table.

Roughly:

King      4  2000sf

Queen   2 1000sf

Suite     4  3000sf

My attached schedule gives a row for each space, except that it groups spaces of exact same areas.  I want a single row for each room type. 

Also, when working with spaces sometimes using Space_Add, Generate I am met with the response that a space already exists and no space can be added.  The "phantom" space does not show up in the schedule, thawing all layers does not reveal any space and I've tried all my selection tricks to parse a space from the closed boundary that appears empty.

View 4 Replies


ADVERTISEMENT

AutoCAD Architecture :: Schedule With Area And Perimeter

Mar 4, 2011

The architect has a schedule set up that will schedule his room numbers and names. He draws spaces for each room.

I want to add perimeter and area to this. I copied this room schedule in the tool pallete, renamed it with "trial", added columns for perimeter and area, BUT STILL GET ? FOR VALUES!

I've looked everywhere and it should work. When I look at "properties" of the space it shows area and perimeter, but I can't figure out how to extract the info.

View 3 Replies View Related

AutoCAD Architecture :: Schedule Tag With Dimension Value

Sep 4, 2012

I'd like to apply a property set to a dimension, tag it, and have the tag display the dimension value.  This tag would be remote from the dimension, and on a separate layer, which would remain on when the dimension layer is frozen.

At present, the property set for dimensions appears not to include the dimension value.

View 6 Replies View Related

AutoCAD Architecture :: Creating Schedule Tags

Jan 3, 2014

I am having trouble creating custom schedule tags.  I have followed the tutorial "to create a schedule tag", but it does not work for me.  First off it is not annotative, I created it in 1 to 1 scale and checked the plotting scale to ensure it is 1 to 1.

Also, it creates the block, and I get it into the tool pallet, but when selected, it just inserts a block.  I am trying to create a door tag, so when I select it from the tool pallet, it does not ask me to select a door to tag, just inserts the block.

The tag I want to create is very simple, I want to modify the OTTB Door Tag - Project Based, to remove the suffix and center the door number.

View 1 Replies View Related

AutoCAD Architecture :: Attribute Data To Schedule

Mar 4, 2013

Possible to send attribute data that is in our title block to a schedule that is populated with property set definitions? We are not using the Project Navigator at this time.

View 2 Replies View Related

AutoCAD Architecture :: Schedule Tag Error Message

May 23, 2008

I am getting an error message when I am trying to insert a schedule room tag. It does not matter which room tag out of the content browser I select, I get the same message. the message is as follow: "No symbol has been specified for the tag" All of the tags have worked up until today. Nothing has changed that I know of on our network and all of the paths seem to be pointing to the correct directories. We are currently using Architecture 2008. This problem is only coming up with these specific room tags.

View 3 Replies View Related

AutoCAD Architecture :: Getting The Space Name To Appear In Room Schedule

Nov 1, 2013

I've created a number of spaces, and I want the space name to show up in a Room schedule.  Here is a picture of the Properties window with one of my spaces selected.  The space name is 'Spanish 2'. see first attachment

I understand I need to add a column to my room schedule that has this value in it.  Here is an image from the 'Edit Schedule Table Style' dialog and the 'add column' sub dialog.

see second attachment

which one of this rather lengthy list is the correct one?  I've tried all the values that have 'name' in them but all I get is '?' in my schedule. I've attached the file I'm working on. I created the spaces by dragging and dropping from the tool palettes out of the box, and the room schedule the same way.

View 6 Replies View Related

AutoCAD Architecture :: Justify Entire Schedule?

Dec 6, 2012

Is it possible to Justify an entire schedule?  It appears that my schedules have an anchor point that is the upper right corner.  Is it possible to change it to the upper left corner?

View 3 Replies View Related

AutoCAD Architecture :: Schedule Tag With Multiple Property Sets

Mar 16, 2012

I've got a multi-family building where I'm trying to create a schedule tag that will number walls sequentially in a view drawing. The units are elements that are then brought into a construct and mirrored and rotated as needed.

The first thing I did was to create a Property Set  that uses Level and Manual property set that automatically increments to create a property called Unit Number. Then created a tag that will number the units in my building i.e. : 201 202 etc.  This works fine.

I then created a Property Set to apply to the walls that uses the Unit Number from the other Property Set along with a Manual Property Set that increments as well to create a wall tag.  What I am expecting to get is 201-01, 201-02 etc.  What I’m getting is ?-01, ?-02 etc.

View 7 Replies View Related

AutoCAD Architecture :: Material Takeoff Schedule Not Working

Feb 14, 2011

I am having a hard time creating a material takeoff schedule in ACA 2011.  I can't seem to get it to give me a square footage of any material.  I can get the left and right side gross or net square footage.

I created the walls with components and mapped materials to these but I can't seem to get that info in the schedule.

View 1 Replies View Related

AutoCAD Architecture :: 2014 - Scaling Schedule Tags

Oct 1, 2013

how to get the annotative scale to work with schedule tags.When I use attributes in blocks I draw the attribute definition with a height that I wish it to display in PaperSpace.  Then when defining the block I select the annotative scale so that the block and text display correctly in any viewport.

However when I create Scheduling Tags using the Create Tags button on the Annotate/Scheduling tab it shrinks the text by 1/8" as soon as the tag is created.  I've made sure that the scales are set to 1:1 when I create it.  I guess I can just enlarge the text 8 times before I make the Tag. 

View 4 Replies View Related

AutoCAD Architecture :: Unable To Export Schedule To Excel?

Jan 26, 2011

I'm having problems in exporting a window schedule from ACA 2010 to Excel.  I have Excel 2010 installed on my home computer. 

when I try to export I get the message that excel application may need to be loaded.

View 1 Replies View Related

AutoCAD Architecture :: Schedule Tag Is Created At Wrong Scale

Dec 21, 2013

I'm using ACA2013.  I've been working on making a couple of custom schedule tags and have found what seems to be a bit of a glitch.  I have the annotative scale set to 1'-0"=1'-0".  Once I have the desired linework and attributes created, I have used the 'create tag wizard'.  Once that is finished, the tag is inserted at a much smaller size than the linework I used - 1/10.6666.  If I scale the linework and attribute text size by 10-2/3 prior to using the 'wizard' then the tag is created the correct size.    Is there something I'm doing incorrectly or is that a glitch in ACA2013?

View 6 Replies View Related

AutoCAD Architecture :: AEC Schedule - Lookup Table For Different Manufacturers?

Nov 25, 2013

So, I'm familiar with creating Property Set data and schedule styles and all, but I am having trouble wrapping my brain around the following, I would love to know how you tackled it in the simplest way possible:

I need to show a schedule for Windows and Doors, that will read the drawing or selection, and list all the door and window types.  Now, that is not so bad, but there is a caveat that I can't get past. 

We offer two or more Manufacturers for said windows and doors and are being asked to show tags on our floor plans that reference a table that says:

"For window type "1", ship either Manufacturer A - Part No. X, or Manufacturer B - Part No. Y  

What I can't wrap my brain around right now is how to get Property Set data to know that "1" means both of those parts, and not one or the other.  The way this is supposed to work, is for each of our plans we are to have only the types ("1", "2", etc.) that are currently shown on that plan, and if one of those windows or doors change to a different type, have the schedule update automatically.

I would prefer not to need to write a LISP or Vlisp that does this, but am open to using VBscript in the Property Set Data, I am just unsure of how to write that into a Formula.

View 4 Replies View Related

AutoCAD Architecture :: Make Door Schedule Having Room Name

Mar 6, 2011

I need to make the door schedule have the room name in it. I am using the project based door tag so it is already numbered like the room tag.

View 2 Replies View Related

AutoCAD Architecture :: Schedule - Formula Column Totals

Nov 22, 2013

when creating a schedule with a simple formula column (e.g : [QUANTITY]*Width), the formula column total doesn't add the formula results for a grand total. The total shown is the addition of Width of element.If I try and enable "Apply formula to totals", the total is : total quantity*total width instead of just a simple addition of formula resulting values.

For example:

I have 4 windows of 2 different styles.Two windows have a width of 2 meters, the other 2 windows have a width of 3 meters. I want to find out, my total window width, of all window styles.Therefore, i make a schedule with the following columns: QUANTITY, WIDTH and TOTAL WIDTH. The total width column is a formula column (Quantity*Width). The total of the formula column (Quantity*Width) doesn't add the resulting values (2*2+3*2=10), it only adds the simple widths without multiplication with quantity, my result is 5, wich is incorect. If i enable "Apply formula to totals", it multiplies total quantity (4) by total width (5).

View 4 Replies View Related

AutoCAD Architecture :: How To Show Space Style In The Schedule

Nov 24, 2009

I am having a problem with project based door tags getting the *ERROR GETTING VALUE*. I have checked the synchronizations and they are fine. The tags work in all our other projects, just not this one. We are also having some problems with a ? showing up for a space style in the schedule.

View 8 Replies View Related

AutoCAD Architecture :: Schedule Table - Setup Plot Coordinates

Apr 20, 2011

What is the best way to setup Plot Co-Ordinates that have a tag that updates as you move the co-ordinate point and also I would like to schedule these points in a table ..

for e.g. :

Plot A
_______________________

E 123456.789 N 123456.789

View 2 Replies View Related

AutoCAD Architecture :: Edit Door Schedule Title Font?

Aug 7, 2011

I am having trouble trying to edit the title fonts in a door schedule.  No matter which font I pick under "Edit Schedule Table Style" after a selection of the schedule and right clik, the title font will not change.  The listed doors font does change.  Is it not poosible to change the title and descriptor font?

View 1 Replies View Related

AutoCAD Architecture :: Get List Of Schedule Style Defined In The Drawing?

Feb 18, 2013

I have the below code where by I can gain access to property sets.

But it doesn't look like the Schedule Styles are there.

How can I change this up to get access to Schedule Styles defined in the drawing?

(setq acadObj  (vlax-get-acad-object)
schedApp (vla-getInterfaceObject
acadObj
"AecX.AecScheduleApplication.7.0"                 
)
)

View 2 Replies View Related

AutoCAD Architecture :: Sheet Keynote Schedule Table Style?

Mar 16, 2012

Im trying to change the table style formatting and nothing seems to stick.  I want to turn the border off in the title cell and only use a thick underline.

I change the schedule cell, save changes to the style and Ive tried saving as a new style but when I reinsert the cell format is gone.  Back to the out of the box state.

Also, when I save the OTB style to my new A3 Sheet Keynote style the new style doesnt match what was saved.

View 3 Replies View Related

AutoCAD Architecture :: Creating Schedule To Pick Up Room Areas

Oct 7, 2012

I am creating a schedule to pick up the room areas and additional information to do with artificial lighting.  That bit is the easy bit.

What I am trying to do is put a column in the schedule that shows how many light points are within that particular space. I have looked into ticking the quantity box, but that picks up just the spaces.  If there was a way that this could be used to pick up the blocks in a particular space, and not the spaces that would be the simplest way to solve this (I think anyway).

Just to let you know, I am using Dynamic Blocks for the light fittings.  As I can have all the different types within the one block.  I have heard that I can do this using the MultiView blocks (I haven't explored this yet), but the amount of blocks that I need is going to be increased (from what I know about MultiView blocks).  The simpler this is, the better I believe.

I have tried using Count under the Automaitc Property, but when used, adds the blocks as an extra row, not into the desired column.  I may have to add something to the block to get it to do what I want it to do, but don't know how to do this.  At the moment, I am putting this information manually into the space properties.

The next part to my question, and again, I maybe asking a bit too much here, but I want to take two totals from two different columns to create an average. If I could do this in the one table, fantastic!  If I have to create a second schedule to pick this up, that is ok I suppose, but I would then do the math for it manually and just write it in if that was the case.

I'm using ACA 13

View 8 Replies View Related

Revit :: Place Surface Area Of Annotation Fill Into Schedule?

Jun 26, 2013

Is it possible to place the surface area of an annotation fill, into a schedule?

View 1 Replies View Related

AutoCAD Architecture :: Schedule Tag - From Ribbon Bar - Uses Current Text Style / Font

Nov 1, 2013

We're transitioning from ACA2012 to ACA2014.  I'm also trying to get away from putting my blocks in DesignCenter and having our users insert Annotation (tags) from the Ribbon bar.

When I insert our door tag (or any schedule tag) from the ribbon bar, it is automatically changing the text style to the current text style.  I'd rather it just use the style built into the tag.  I know that can be controlled in the Designcenter content (right-click) - but how do I change that from the ribbon bar?

View 2 Replies View Related

AutoCAD Architecture :: Link Frames Width And Height To Door Schedule?

Oct 17, 2012

how to link a door frames width and height to the door schedule?  For example if I have a 3'-0" x7'-0" door the frame width would be 3'-4"x7'-2", I would like this to automatically generate in my door schedule when I insert a door without me having to manually put it in.  I am using AutoCAD Architecture 2010.

View 6 Replies View Related

AutoCAD Architecture :: How To Change Appearance Of Lines In Room Finish Schedule

Jun 28, 2012

How to change the appearance of lines in a room finish schedule? I want to be able to have some appear bold, others to be a double line, and some to be thin? Currently when i load the standard room finish schedule the lines are not what i want them to look like. 

View 1 Replies View Related

AutoCAD 2013 :: Architecture 2014 - Formula Column Totals In Schedule

Nov 22, 2013

when creating a schedule with a simple formula column (e.g : [QUANTITY]*Width), the formula column total doesn't add the formula results for a grand total. The total shown is the addition of Width of element.

If I try and enable "Apply formula to totals", the total is : total quantity*total width instead of just a simple addition of formula resulting values.

For example:

I have 4 windows of 2 different styles.Two windows have a width of 2 meters, the other 2 windows have a width of 3 meters. I want to find out, my total window width, of all window styles.Therefore, i make a schedule with the following columns: QUANTITY, WIDTH and TOTAL WIDTH. The total width column is a formula column (Quantity*Width). The total of the formula column (Quantity*Width) doesn't add the resulting values (2*2+3*2=10), it only adds the simple widths without multiplication with quantity, my result is 5, wich is incorect. If i enable "Apply formula to totals", it multiplies total quantity (4) by total width (5).

I need a solution for having the corect total on the formula column.

View 3 Replies View Related

AutoCAD Architecture :: Paper Space Schedule Tag An Object Nested Inside Xref?

May 2, 2012

We've been working with adding schedule tags in paper space for objects nested within an xref. The first time you do this however, the manual properties (it seems) do not update if the value of the manual property is changed back in the xref dwg. However, the Automatic properties do seem to update.

When we initially found this we past it off as a limitation. However, one of our users was experimenting and found that the first time you tag the xref resident object... the schedule tag reads the correct manual properties value. However, If you remove the property set from the schedule tag... then the manual property will update correctly showing the current value as it is back in the xref dwg even if it is changed.

This makes complete sense as the manual property set data can be edited from either the tag or the object or from the schedule... IF THE TAG and the object are resident in the same drawing file - in this case you DO NOT want to delete the property set from the tag... if you do this the property set is also removed from the object. However, when tagging objects nested within an xref, then you need to remove the property set from the tag... THEN the manual property will update correctly.

View 2 Replies View Related

Revit :: Why Create Area Schedule Of Areas As Opposed To Using Room Areas

Sep 22, 2011

What is the difference between rooms and areas? Why create an area schedule off 'areas' as opposed to using 'room' areas? Can you create a schedule off room areas?

View 2 Replies View Related

AutoCAD Architecture :: Do A Door Schedule By Styles Rather Than Individual Door

Apr 29, 2004

--Is there a way to do a door schedule by styles rather than individual door?

--To clarify: I want my door schedule to create a new door number only when one or more of the property sets, classifications, or door styles pertaining to a door are not defined by other doors in the schedule. This would facilitate giving the same door number to multiple doors that have matching schedule information, and cut down on my schedule size.

--how to do this. If I need to create custom tags, schedules, or formula properties.

View 9 Replies View Related

AutoCAD Architecture :: Can't See Area Where Write Commands

Feb 12, 2011

I can't see the area where I write commands any more, may be  a configuration thing because never happened to me before.