VideoStudio :: Move Timeline Over In Pro X4?

Jul 28, 2011

how to move everything i have in the timeline over so i can put other things in front of it?

View 4 Replies


ADVERTISEMENT

VideoStudio :: X4 - How To Move Timeline Around

Aug 25, 2012

I'm working on a short project on Corel Videostudio X4. I have been working on the timeline, but can't figure out how to move the timeline around. For example, is there a way I can take the whole project and push it forward 30 seconds so I can stick another clip in?

View 4 Replies View Related

VideoStudio :: How To Move Overlay Track Through Timeline

Nov 11, 2011

How can i move an an overlay track through the time line ?

EX. the overlay track is a logo & i want it to keep moving around the screen through the video.

View 10 Replies View Related

VideoStudio :: How To Move Video Track In Timeline

Feb 5, 2011

I'm VERY new at Corel Videostudio Pro X3.How do I move the video track in the timeline? I can't make it work unless the clip is in the overlay track.

View 7 Replies View Related

Premiere Pro :: How To Move The Clips To The Timeline

Apr 17, 2014

Nothing happens when I try to move the clips to the timeline. Have Windows 8.1. Premiere Pro CC.

View 3 Replies View Related

AutoDesk Smoke :: Move Keyframe In Timeline?

Feb 20, 2013

Is it possible to move keyframes in the timelime or do I have to go into the animation curves menu to do it?

View 2 Replies View Related

Premiere Pro :: Move Timeline Cursor From End Of One Clip To Start?

Mar 28, 2014

I'm a FCP person who has gone to premier cc because I dont like the new ver of FCP which seems to be imovie on steriods.  How do you move the timeline cursor from the end of one clip to start of the next.  In FCP ver 7 it's a simple button.

View 2 Replies View Related

AutoDesk Smoke :: 3D Text Move In Action / Want To Layer It On Top Of Timeline

Jan 23, 2013

I'm doing a simple 3D text move in Action and I want to layer it on top of my timeline. After rendering the layers in the timeline, it seems that my matte is messed-up (see attached).

View 2 Replies View Related

AutoDesk Smoke :: Timeline Edit - Move Clip Straight Up Using Constraints

Dec 14, 2012

i have a clip in layer 1 and i want to move it to layer 2 , i don't want accidentally move in horizontal direction (change edit point), i want to move straight vertically. Using FCP hotkey, i can activate snap (shift key) to constraint it to a cut, but that only works if i got another clip, if there's no other clip , i can't do constraint since there's no reference. In FCP i can still doing it because it can use the current clip's previous position as reference edit. But in Smoke , i can't do that. I think there should be a feature added for this process. The workaround is : do not move the clip but using duplicate, then delete the original one... but seems too complex for that little tiny task.

View 5 Replies View Related

VideoStudio :: 9 - Red Bar Across Timeline?

May 8, 2013

Something I haven't met before and can't find in the manual. Not sure what I touched but a red bar has appeared on the timeline, running from the start of the project to the point where I was editing. Now it will only play the project from the start to this point and I can't add a title after this.

How can I clear this red bar?

View 3 Replies View Related

VideoStudio :: X4 / Add Markers On Timeline?

Jun 30, 2011

How do you add markers on the timeline? Also, can I add markers to individual clips so I can line them up? Example, have a beat to a music lined up, and on a video I got something I want to align with the beat, can I place a marker on the audio and another on the video?

View 2 Replies View Related

VideoStudio :: X6U - Timeline Markers

Nov 30, 2013

I use another NLE and VSP X6U. One thing that I would like is timeline markers. Why? I do quite a few videos where the transitions have to be on the beat of the music. I do this with timeline markers that are placed on the 'beat' of the music. I can then move the in and out points of a video or image and it will "snap" to the position of the marker.

Also, I can label these markers, so I can use them to "remind" me of what I want to do between them.

View 7 Replies View Related

VideoStudio :: Add MP4 File Using Pro X3 In Timeline?

Dec 28, 2010

WHen i try to add MP4 file using videostudio pro x 3 in the timeline , i get this error below . THe file type is MPEG 4 media file.

When i convert it to WMV file , it works . videostudio can have a patch and fix this because it takes me so long to convert from MP4 to WMV . This file type is now Windows Media Movie.

View 14 Replies View Related

VideoStudio :: Insert Clip In Timeline

Feb 1, 2013

certainly the topic has already been covered but with the hundreds of responses I struggle to find it, then propose it a new:

how do I put in the time line already been settled for good, a video clip so that the whole time line moves?

Note: I added the other video clips in many 4-track, not using the main track, which is empty.So should I insert a video clip that I had forgotten about 20 minutes before the end, so you have to move automatically all the work (including effects, subtitles, etc), so it all coincides, without having to move the whole hand. ...

View 2 Replies View Related

VideoStudio :: Moving Of All Items On Timeline

Apr 5, 2013

I have added some pictures too the timeline(slideshow) and i want too add some pictures between items on the timeline. i would like to move items too the right side, including music, text that is already placed underneath the pictures.

With adobe premiere this is really simple, i have watched about 100 clips at you tube but can't find it. I have tried using the CTRL key but than i need to select each item seperate...way to much work to select hundreds of items.

View 2 Replies View Related

VideoStudio :: Meaning Of Orange Bar On Timeline?

Aug 6, 2010

What does an orange line between the timeline and the chapter / cue marker line indicate. (see picture below).

I am halfway through a project and suddenly notice this orange line that wasn't there before. I've looked through the documentation and see no mention of its meaning, and what I did that triggered it to show up.

View 9 Replies View Related

VideoStudio :: Combine 2 Or More Projects Together On Timeline?

Jun 18, 2012

Is there a way to combine 2 or more projects together on a timeline, such a way that you can see/adjust all clips, overlays etc from each of them?

View 2 Replies View Related

VideoStudio :: Manual Fade In / Out In Timeline?

Jun 4, 2011

i am using video studio since its 8 version. now testing the trial version of x4. but a very useful editing tool, i think, missing still now. that is video editing fade in fade out manually in the timeline. its possible to do this in audio. but is it possible in case of video. many other video editing soft. do this. but why corel still not updating in their package?

View 6 Replies View Related

VideoStudio :: X4 Saving Timeline Progress?

Jul 4, 2012

Is there not a way to save the progress of your timeline? So far my workflow has me editing every clip in library mode, then transferring it all down to the timeline so I can insert music, titles, transitions, etc.....and due to the size of my project, I wasn't able to finish before leaving tonight. So I saved everything (or so I thought), but when I opened my project later in VS again, there was nothing in the timeline! (it saved all of my edited files above in the library, but all of my work on titles, overlays and music was lost). Did I do something wrong, or does this program force you make all of those detailed edits and additions in one fell swoop without any chance of saving or taking a break?

View 4 Replies View Related

VideoStudio :: 60 Seconds Interval In Timeline?

Feb 14, 2011

When I use the timeline everything goes from 00:00sec to 00:24sec then it gabs to 01:00 and so on.... Why is that and can I change it to use 60sec instead?

View 2 Replies View Related

VideoStudio :: Main Timeline Vs Overlay?

Jun 15, 2011

Is there an advantage to putting videos or photos on the main timeline as opposed to starting everything on an overlay track? On a previous post (Resizing overlay tracks) resize problem with photos and began to wonder if all of the editing couldn't just take place on overlay tracks.

View 1 Replies View Related

VideoStudio :: X5 - Reverse Clip In Timeline?

Jul 23, 2012

I want to reverse a clip in the time line and cant get to the appropriate place to do so in X5.I click the media icon-select the clip in the timeline-click options and the FX screen shows.I am not able to get rid of the FX screen to get where I want to.I have selected the storeyboard view and gone back but still the FX scgreen is the only option.

View 6 Replies View Related

VideoStudio :: Jerky Playback Within Timeline

Dec 13, 2012

Not had this before, just put a couple of minutes clip into the timeline ready to edit and when I play through it, the video is jerky/jittery on playback. If I click on it in the library and play it without pulling it in to the timeline, it is fine, and if I click on the video without opening the programme, it also plays fine ? If you watch the timeline scrubber as the video jerks, you can see a trail of little white shadows that the scubber leaves behind as it stutters ? I have tried with other clips and it does exactly the same ! The clip is AVCHD clip, and.... I have let it create a smart proxy file before playing it.

View 13 Replies View Related

VideoStudio :: How Does One Position A Clip Along Timeline

Aug 7, 2013

How does one position a clip along the timeline where it needs to be? I'm either doing something wrong or there is a bug in the software

dragging a video clip(any format) from the library to the video track results in the clip being placed at the beginning. I cannot be drag/re-position it along the timeline. Also, the clip can be shortened using the handles on either end, but cannot be expanded back to its original size in the timeline. for now, I'm using the trim markers to do so. I contacted tech support & received a head-scratching out-of-context reply. Either they're not understanding me or don't care.

View 2 Replies View Related

VideoStudio :: Parking Footage On Timeline?

Jun 10, 2011

Well, I bit the bullet, and I'm slowly learning the tricks of Video Studio. Here's my question... is there anyway I can "park" footage on the lower video tracks without them showing up in my preview video? In other words, I typically place clips on lower timeline tracks and eventually insert them into the final video after tweaking the main video track. When "other" clips are parked at the lower tacks, they appear in the preview footage, which I do not want to see.... yet.

View 3 Replies View Related

VideoStudio :: Deleting Video From Timeline

Oct 22, 2013

I'm currently working on a video that has alot of individual pictures etc in the timeline. I would like to delete a few of the pictures from the video. when I delete the pictures I get an opening in the video that I don't wish to have. How do I shift the entire video over to fill that gap? On the flip side of the coin. Is there a way to insert a clip into the timeline and shift everything down around the inserted clip?

View 3 Replies View Related

VideoStudio :: Timeline Display Mode

Jul 5, 2011

I'm looking to upgrade from my copy of Ulead's Media Studio Pro 7. According to the Ulead's web site, "Corel is not planning any future updates to this product" so I'm assuming that Video Studio Pro X4 would be Corel's replacement product.

Media Studio Pro is the FileStrip Mode of the Timeline Display. I'm experimenting with the trial version of Video Studio Pro X4 and I haven't found a way of getting that type of display mode. Is it possible to get the timeline to display such a mode?

View 2 Replies View Related

VideoStudio :: Deleting A Clip From Timeline In X6?

Jun 24, 2013

Every time I delete a video clip from the timeline the music track gets deleted as well. How can I avoid deleting the music track?

View 4 Replies View Related

VideoStudio :: X4 - Automatically Scroll Timeline

Feb 18, 2012

what the function is of the small rectangle (left under in the VSX4 screen) which, when hit shows "Automatically Scroll Timeline" .

View 5 Replies View Related

VideoStudio :: Exporting Timeline Clips

Sep 8, 2013

Just upgraded to X6 last week to start to edit a short movie that I am working with my students. Since is our first short with a lot of takes (about 74 takes in 7 scenes) and we had a lot of problems shooting because take more time them we thought! Well, now I am editing it but I need to export the edited clips (takes) in the time line to add special effects in HitFilm, so theres a way to export all those clips as MP4 or any format in a batch?

View 5 Replies View Related

VideoStudio :: Red Line Appeared In Timeline

Jan 18, 2011

Returning to Video Studio 10 after a period of disuse. All went fairly well until I managed to do something which resulted in a red line appearing in the timeline as per the pic below...

As a result, I can't view any part of the (as yet rather short) compiled video as hitting 'play' takes me straight to that red lined section (which is blank)...

View 3 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved