Photoshop :: BASIC TASK
Apr 13, 2004
Well how can I work with photoshop, when after I save TOP LEFT it locks the image and I can't rotate it to make the other corners?
Everything is locked and I'm quicky getting frustrated here and wondering why I paid money for something that won't work they way I need it to.
I mean using Namo web editor wasn't this hard, it was easy right out of the box, and every button worked how it was suppose to and did not lock the image or lock up at all.
It's gotten so that I have to shut down photoshop and restart just to do anything or create another layer to unlock an image. Then, none of the buttons won't work after the 1st working, I click on elliptical and it does nothing, but display a double headed arrow.
View 8 Replies
ADVERTISEMENT
Mar 9, 2006
I am producing some discount cards for a buisness and will place eight of them on to size A4 document, how can I divide the document automatically so that eight equal spaces appear repeated across the page. I have tried defining a pattern but did not work the way I wanted.
View 1 Replies
View Related
Mar 18, 2012
I have to adjust some images so they get square. I.e. 220x220 px. I made a Action that works fine. But there is 2.000 images so I was making a droplet to automate the task. But when I use the droplet I get the following error:
Start Droplet
File: "/Users/Magooi/Desktop/My Droplet/"
Error: The object "Background" is not currently available. (-25922)
I use CS5.1 on Mac
View 25 Replies
View Related
Feb 3, 2013
I have to imbed meta data to 2500 jpg images. What is the most efficient way to autmate this task?
View 5 Replies
View Related
Jun 10, 2013
Is there a possibility to distribute a batch task between several computers? For example rendering raw files into jpgs and applying actions.
On bigger events it would greatly reduce the waiting time for the processed files. Instead of one computer working for two hours, maybe two machines could do it in an hour?
Of course I can split the files and start two separate batch tasks on separate computers but a task server would make the workflow easier. 3D and video software have a lot of options for distributed rendering..
View 4 Replies
View Related
Apr 9, 2009
When I maximize an image in CS4 the image goes to full screen and covers the tool, task bars, and everything else. Is there a way to keep it from doing that? It did not do that on my CS2.
View 9 Replies
View Related
Nov 15, 2013
I am trying to batch plot a series of IDW drawings through task scheduler, the results is the wrong proportions and size, I am wondering if there is setup command in task scheduler that can be modified or if the proportions are wrong due to the IDW setup within Inventor itself i.e. page not setup correctly.
Autodesk Inventor Professional 2013 SP2 64-Bit Edition
Windows 7 HP Z400, Intel Xeon W3550 3.07GHz
12.0GB RAM, ATI FirePro V4800 (FireGL)
View 2 Replies
View Related
Aug 22, 2011
I have a .NET plugin that loads an ArcSDE geodatabase layer programmatically using AcMapMap.LoadLayer(layerFilepath). I have been trying to programmatically remove the layer from the Task Pane using AcMapMap.GetLayers().Remove(layer), but this function is returning 'false' and is not removing the layer.
View 7 Replies
View Related
Mar 21, 2012
I´m having a problem with the Inventor 2012 Task Scheduler. I´ve done a couple of migration tasks over the last 2 months, actually quite some big tasks on our Vault Server.
Now I´m getting no more access to the application, it´s either showing a message that the server is busy and not responding or the application starts up and sits for a minute in the task bar and then opens up but still I can´t click any menus or create a report to control the tasks I've done earlier.
But I need to check the last couple of tasks to see which files have been successfully migrated and which are not. I know that I can view the logfiles manually but that still leaves me with no more tasks that I need to run to fix our database and Inventor files.
Let the application run with administrator rights doesn't work either. What else could be done to get the task scheduler back up running?
View 1 Replies
View Related
Mar 12, 2009
My task scheduler crashes as soon as I dbl click on it, does not even go to main window. Is there a way to only reinstall this part of INV Suite.
View 9 Replies
View Related
Mar 16, 2012
I'm using TaskForms (Autodesk.Windows.TaskForm), and it's all working pretty well, with one exception. I can't seem to disallow cancellation of the taskform. The class has a property called AllowDialogCancellation, but regardless of what I set that to the dialog still has a clickable X, and can also be closed with the escape key.
View 2 Replies
View Related
Sep 17, 2012
We have a problem with Inventor freezing when saving idw. It is not possible to end Inventor process in task manager so the only way to quit Inventor is to force a complete PC shutdown.
View 1 Replies
View Related
Mar 16, 2012
in auto cad structural detailing 2012 when i want to switch to asd reinforcement classic it will now say the workspace is not compatible with the editable task,
View 1 Replies
View Related
Jun 27, 2012
Is there a way by which I can run a vba - macro over all the file in a folder using Task scheduler.
Config :: Intel (R) Xeon (R) CPU E31245 @ 3.30 GHz, 16.0 GB, 64bit win7
Inventor 2013 and Vault Basic 2013
View 3 Replies
View Related
Nov 25, 2011
I have a problem when switching between different programs, eg LR, Word, itunes, Firefox. When returning to LR, it has moved behind the task bar which is fixed on the left on my screen. Since the file menu is then covered by the task bar I have to shut down LR frequently via the task bar. This only happens with LR. I am using LR 3.4 on Win 7 Prof 64bit on a Sony notebook.
View 7 Replies
View Related
Aug 29, 2012
I was checking XP Task Manager just now and noticed that although PSP8 isn't running as far as I'm concerned (there are no PSP8 windows open), its executable still appears in the task list.
[URL]
View 3 Replies
View Related
Jan 20, 2013
Had this installed and working fine for a month or so. Just learning how to use this when today when I went to start it up it would get to the welcome box and just stop. The box was completely blank and the only way to turn the program off was to use the Task Manager to close it down. After reading a few post on similar situations - the advise was to uninstall then reinstall the software. Used the windows uninstaller, afterwards rebooted then tried to re-install.
When I put in the the DVD I get to the screen where I accept the license agreement - scroll to the bottom and check the box to accept - hit next and nothing happens. I checked the services.msc and the Application Experience is started and on automatic.Tried this in the internal and external DVD drive with the same results.
View 2 Replies
View Related
Jul 16, 2013
I want to automate the check in of design files to Vault on each PC, prior to running workspace sync (Vault) which does have command line support.
I know you can schedule tasks within the Inventor Task scheduler, but has task scheduled the Inventor Task Scheduler? I suppose in theory you could schedule the launch of Inventor Task scheduler via the Windows one? or is there any need? If the Inventor Task scheduler isn't running, but a task has been scheduled, will it execute the program itself?
View 2 Replies
View Related
Aug 24, 2010
I am trying to use Task Scheduler to migrate all my .ipt files from 2010 to 2011. When I do it however it gives me the error , "cannot create Task" in a little pop up message box. It does this will types of task , i.e. I can not create any tasks ever.
View 2 Replies
View Related
Jan 18, 2011
I created a task to import (convert) a specified folder of MDT files using a specified ini file to ignore the layout drawings (tests resulted in near-useless idws with most missing drawing views - mainly due to our ignorance in creating MDT drawings). I specified a subfolder as the destination for the converted ipt files. After the task runs, the ipt files appear in the main folder (where I did not want them), while the destination folder has files with the names of <original part number>.dwg.ipt. The ipt and dwg.ipt files appear identical and have the same feature tree.
A typical entry in the Import.txt file is:
22926.dwg Get Translator Success ...InventorConvert MDT Files
dwg 22926.dwg Open Success ...InventorConvert MDT Files
dwg 22926.dwg Import Success ...InventorConvert MDT FilesInventor parts converted from MDT files22926.dwg.ipt
dwg 22926.dwg Close Success ...InventorConvert MDT Files
So I'm not sure what I'm doing wrong here. It appears to be mainly working, but it will require cutting/pasting/deleting I wasn't expecting. The main goal here is to create ipt files that our CAM system can (we hope) work directly with, as they dumped the MDT translators a while back.
Inventor Professional 2014 64 SP1
Windows 7 64 bit - SP1
Xeon E5-1620
16 GB Ram
Quadro 2000
View 2 Replies
View Related
Nov 27, 2012
what is the benefit of using Task Scheduler to migrate all of my Inventor files to the latest versions?
I've upgraded several times, but I've never done a full file migration.
View 3 Replies
View Related
Jan 3, 2013
I am batch publishing .idw files to .dwf and the default file name that it creates is XXXXX.idw.dxf. how to remove the .idw? Is there is setting in Task Scheduler that can be changed?
View 1 Replies
View Related
Aug 2, 2012
When I am in the Autodesk 2013 Task Scheduler and I click on the log file path to view the log file..... I get the log file, but it also opens the "View Downloads" window.. which I dont want.
It just started this in 2013 and it does it on every computer that I have tried it on.
Is there a way to make it not open the "View Downloads" when I view the log file?
View 6 Replies
View Related
May 8, 2012
I want to save a bunch of inventor 2009 idw's to AutoCad dwg's
I realize there are add-ins available for doing this, however i wanted to see how Task Scheduler performed this. I chose a export files task then selected the idw's to save as dwg's
This all went well until i looked at the result.
two things the dwg is saved as filename.idw.dwg I do not want or need the .idw in the new file name, but can find no setting to remove this.
The dwg's are saved to a zip file. Again i neither need or want these in a zip file I just want them save in the same folder as the idw.
View 9 Replies
View Related
May 24, 2013
I'm looking for a way to be able to get the latest .ctb files and tool palettes, weekly automatically,almost like task scheduled in inventor, so when the .ctb of palettes gets updated, the users get it automatically,
tried inventor task schedular, by getting the latest folder, but the file types is not supported.
View 1 Replies
View Related
May 8, 2012
It has done this a few times on me with different files. I am trying to migrate our library of parts. It will get to 76% complete and locks up. showing no memory in use and not building any memory in the task manger process. I set the options to skip unresolved and to not purge old versions. I have to kill the process and then stop the task to close it. I am having more trouble with 2013 in the first couple months than I did with all of 2012. too late to turn back now.
View 3 Replies
View Related
Dec 4, 2012
I have been having problems getting Task Scheduler to work. Its failing to connect to the database?
Its teløling me that path is not valid. How to I change path to be valid?
View 7 Replies
View Related
Sep 27, 2006
I am using task scheduler to import about 20 Step files. I have feature recognition installed which of is a bit of a problem with Task Scheduler. Besides uninstalling, is there a way to suppress the dialog box that comes up on import of a step file.
I do not really want to watch my 20 step files being imported.
View 5 Replies
View Related
Dec 14, 2011
I just created and ran a migrate task using the Autodesk Task Scheduler. I selected several folders and migrated the files from Vault. When the task completed, there were several files that failed. The majority of them had "---Failed at Child" in the log.
Just to see what the problem was, I did a get latest on several of these that failed and then opened them in Inventor. They all opened just fine without any errors at all.
I am also seeing some entries like "xyz.ipt in 12345.iam -- File does not exist. When I opened the iam after the task was complete, there was no errors and it found the xyz.ipt file.
Question is, why does the task scheduler report these in the log, when there is nothing wrong with the files?
View 2 Replies
View Related
Jul 7, 2011
I am using Corel Draw X3 on windows XP
I have clicked something which has removed the fill and outline properties of an object which appeared at the bottom task bar.
A little paint brush told me the fill colour and a pen told me the outline properties.
How do I get them back?
View 1 Replies
View Related
Jul 15, 2013
I am using MAP3D 2012 and have the following query. Under Task Pane and Display Manager I have added drawing data to a drawing layer. Added Style>Text and selected the Object data I want to have displayed (e.g. drawing number).
Since the drawing is going to be accessed also by users with a simple AutoCAD version I want to copy paste the text from display Manager to a Layer In layer Properties Management.
However, every time I create a new layer and copy paste the text does not appear or carry through.
View 5 Replies
View Related